BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Chelsea, Alabama. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

A Ashiers Check (Drawn on an Alabama Bank) or Bid Bond for 5% of the Amount Bid (Maximum Amount -$10,000.00) and Made Payable to the Shelby County Commis-sion Must Accompany Each Bid as Evidence of Good Faith. The Entire Project Shall Be Completed in 85 Work-ing Days. Liberty Road Bridge Replacement Over North Fork of Yellowleaf Creek in Chelsea, Al The Bracket Estimate on This Project is From $900,000 to $1,000,000. This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bond-ing Companies Concerning the Project's Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid. Nor Will This Bracket Have Any Bearing on the Decision to Award the Contract. An Overview of Pay Items Includes: Clearing and Grubbing Removal of Old Bridge Unclassified & Borrow Excavation Bituminous Concrete Wearing Surface, Upper & Lower Binder Layers Steel Piling Precast Bridge Items (Abutment & Bent Caps, Deck Spans and Abutment Panels) Guardrail & End Anchors Various Erosion Control Items Traffic Striping & Pavement Markers Various Traffic Control Items Requests for Information Shall Be Accepted From Bidders Until Monday, February 2. 2026 at 2:00 P.m. Bidders With Questions May Sub-mit Them via Email, Tele-phone, or in Person at the Office of the County Engineer Prequalification is Not Required on This Proj-ect. Further Details and Definitions Regarding This Provision Are included in Section 102 of Special Provision 22-lpa-001 and Aldot's Standard Specifications. Proof of Insurance Coverages of the Types and Amounts as Set Forth in the Project Specifica-tions Will Be Required of the Contractor, and Any and All Subcontrac-tors, Prior to Beginning Work. The Contractor Will Be Required to Per-form Work Amounting to at Least 30% of the Total Contract Cost With His Own Organization. This is a County-funded Project. The Proposed Work Shall Be Per-formed in Conformity With All Applicable Laws, Rules, and Regulations. The Right to Reject Any or All Bids is Reserved. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$1,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

37

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
64
Bidding Soon
655
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2026

March 9, 2026

Project location map

Multiple Locations, Chelsea, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.