Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 20, 2026 at 7:00 PM
Updated January 21, 2026
Site work for a bridge / tunnel in Elizabethton, Tennessee. Completed plans call for site work for a bridge / tunnel.
Reference Number 0000408944 Question Deadline 01/14/2026 at 10:30 AM ET Questions are submitted online No Garland Road Culvert: GPS: (36.14479, -82.10559): o Remove Culvert, 1 each of metal corrugated culvert, 27 FT long x 96 IN in diameter and replace with 9-FT height x 12 FT width x 30 FT long concrete box culvert. (See H&H Study for details.) Inlet/Outlet Controls: The design includes concrete headwalls and 45 wingwalls, along with riprap for erosion control and energy dissipation around the inlet and outlet. This configuration helps minimize scour and maintain stable flow conditions. Additional Scope of Work Criteria o Asphalt removal, culvert replacements, stone replacement, guardrail replacement, ditching and reshaping, removal of corrugated pipes, placement of precast concrete structure, rip rap rock replacement, seeding and strawing of disturbed areas. o Ditch line Reshaping and Repair with suitable materials Slope Stabilization with Rip Rap stone. o Contractor will be responsible for disposal of all material removed at the time of construction. o Contractor will be responsible for all material to complete work. General Scope of Work Criteria o Contractor will be required to notify Carter County Highway Department and all necessary Emergency Agencies within 24 hours of starting work. o Contractor will be responsible for providing all Permitting, Signage, Rd Closure Notices and any necessary Traffic Detours and/or Traffic Control. o Notification to the Highway Department and all necessary Emergency Agencies is required prior to any closures or detours, including but not limited to inclement weather delays of any kind. o Once the contract has been awarded, a completion date of 120 days will be required with an allowance of up to, but not to exceed 20 days for inclement weather: not to exceed 140 days before project completion. Repairs to Garland Road Culvert General Requirements - Federally Funded - Insurance Required - License Required
GC Bidding
Bridges / Tunnels
$500,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2026
March 5, 2026
Roy Garland Rd, Elizabethton, TN
Related To This Project
Elizabethton, TN
Bid Date: Feb 05 2026
Elizabethton, TN
Bid Date: Feb 05 2026
Elizabethton, TN
Bid Date: Feb 05 2026
Elizabethton, TN
Bid Date: Dec 22 2025
Elizabethton, TN
Bid Date: Dec 09 2025
Elizabethton, TN
Bid Date: Feb 03 2026
Elizabethton, TN
Bid Date: Dec 17 2025
Elizabethton, TN
Bid Date: Dec 17 2025
Elizabethton, TN
Bid Date: Jan 15 2026
Elizabethton, TN
Bid Date: Nov 25 2025
Elizabethton, TN
Bid Date: Nov 25 2025
Elizabethton, TN
Bid Date: Nov 17 2025
Elizabethton, TN
Bid Date: Nov 12 2025
Elizabethton, TN
Bid Date: Nov 24 2025
Elizabethton, TN
Bid Date: Oct 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
