Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2026 at 7:00 PM

Updated February 25, 2026

Site work for a transportation facility in Fostoria, Ohio. Completed plans call for site work for a transportation facility.

As of February 24, 2026, this project has not yet been awarded. The project is expected to be awarded prolly 30 days from now. The project involves the replacement of Runway 9/27 PAPI and REIL at Fostoria Metropolitan Airport. The work requires furnishing all labor, permits, materials, machinery, tools, supplies, and equipment necessary to perform all construction in accordance with the project manual, project drawings, and issued addenda. The scope includes compliance with estimated quantities as a basis for bid evaluation, but payment will be based on actual quantities performed. The contractor must also comply with project phasing as indicated in plan sheets, commence work within ten calendar days of the notice-to-proceed, and complete all work within 10 calendar days from commencement, with a liquidated damage of $200 per calendar day for each day the project remains incomplete beyond the contract time of performance. The contractor must furnish performance and payment bonds each in the amount of 100% of the contract price and all required certificates of insurance. Instructions require that bids be accompanied by a bid guaranty of 10% of the bid price or a bid bond for the full amount, and that all documents comprising the bid are complementary and together establish the complete terms, conditions, and obligations for the successful bidder. The owner reserves rights to reject bids, waive minor informalities, and hold proposals for up to 90 days for evaluation purposes. ODOT GRANT 26-15 Contract Work Items. A general description of the project includes: o Removal of existing PAPI systems and installation of new PAPI systems on both runway ends (Base Bid) o Removal of existing REIL systems and installation of new REIL systems on both runway ends (Add Alt. 1) o Airfield Safety during Construction and implementation of the Construction Safety Phasing Plan Question Deadline 01/30/2026 A bidder requiring a clarification or interpretation of the project documents shall make a written request to the Owner or Engineer. The Owner or Engineer must receive the written request a minimum of five (5) calendar days prior to the date of the bid opening.

Bid Results

Transportation Terminals

$235,685.00

Public - City

Site Work

12

8

6

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
95
Bidding Soon
1,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2026

August 3, 2026

Project location map

4495 N County Rd 25, Fostoria, OH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed