BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2026 at 7:00 PM

Updated February 25, 2026

Site work for a transportation facility in Fostoria, Ohio. Completed plans call for site work for a transportation facility.

As of February 24, 2026, this project has not yet been awarded. The project is expected to be awarded prolly 30 days from now. The project involves the replacement of Runway 9/27 PAPI and REIL at Fostoria Metropolitan Airport. The work requires furnishing all labor, permits, materials, machinery, tools, supplies, and equipment necessary to perform all construction in accordance with the project manual, project drawings, and issued addenda. The scope includes compliance with estimated quantities as a basis for bid evaluation, but payment will be based on actual quantities performed. The contractor must also comply with project phasing as indicated in plan sheets, commence work within ten calendar days of the notice-to-proceed, and complete all work within 10 calendar days from commencement, with a liquidated damage of $200 per calendar day for each day the project remains incomplete beyond the contract time of performance. The contractor must furnish performance and payment bonds each in the amount of 100% of the contract price and all required certificates of insurance. Instructions require that bids be accompanied by a bid guaranty of 10% of the bid price or a bid bond for the full amount, and that all documents comprising the bid are complementary and together establish the complete terms, conditions, and obligations for the successful bidder. The owner reserves rights to reject bids, waive minor informalities, and hold proposals for up to 90 days for evaluation purposes. ODOT GRANT 26-15 Contract Work Items. A general description of the project includes: o Removal of existing PAPI systems and installation of new PAPI systems on both runway ends (Base Bid) o Removal of existing REIL systems and installation of new REIL systems on both runway ends (Add Alt. 1) o Airfield Safety during Construction and implementation of the Construction Safety Phasing Plan Question Deadline 01/30/2026 A bidder requiring a clarification or interpretation of the project documents shall make a written request to the Owner or Engineer. The Owner or Engineer must receive the written request a minimum of five (5) calendar days prior to the date of the bid opening.

Bid Results

Transportation Terminals

$235,685.00

Public - City

Site Work

12

8

6

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
105
Bidding Soon
1,675
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2026

August 3, 2026

Project location map

4495 N County Rd 25, Fostoria, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.