Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2026 at 8:00 PM
Updated March 19, 2026
Renovation of a medical facility in Birmingham, Alabama. Completed plans call for the renovation of a medical facility.
The scope of work includes the replacement of domestic hot water equipment and associated construction for the Mechanical Room on the 2nd floor of the UAB Highlands hospital serving the North Tower. This includes but is not limited to selective demolition, partition and concrete patching and plumbing work. Existing steam-to-hot water exchangers will be replaced, and a modular mixing station will be installed to serve the kitchen and all floors. The scope of work includes the replacement of domestic hot water equipment and associated construction for the Mechanical Room on the 2nd floor of the UAB Highlands hospital serving the North Tower. This includes but is not limited to selective demolition, partition and concrete patching and plumbing work. Existing steam-to-hot water exchangers will be replaced, and a modular mixing station will be installed to serve the kitchen and all floors. Dead piping legs, eroded pipework, and two individual circulation pumps will be replaced as well. The work will be performed using Infection Control measures and the use of phasing may be utilized to minimize facility downtime. The project is located contiguous with fully functioning patient clinical areas and Contractors must have significant experience as a General Contractor in working in a hospital clinical environment and have knowledge and experience with implementation, monitoring, and maintaining Infection Control and Interim Life Safety Measures. This project will require significant coordination, working with the Owner's representatives to successfully deliver the project. The anticipated dollar amount is approximately $850,000- 900,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Prospective Bidder's Pre-qualification Package must be received by the Owner's Project Manager no later than 4:00 PM Central Time, October 31, 2025, after which no further requests will be considered. Pre-qualification Requirements Information Package may be obtained from the Architect upon letterhead request. Any addendums to the prequalification requirements will be issued to documented prime contractors only. A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the Owner. The Owner reserves the right to revoke pre-qualification of any bidder in accordance with Section 39-2-12, Code of Alabama, 1975, as amended in 1997 (by Act 97-225).
Award
Medical
$900,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2026
March 9, 2026
1201 11th Avenue South, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Jan 26 2026
Birmingham, AL
Bid Date: Jan 29 2026
Birmingham, AL
Bid Date: Jan 23 2026
Birmingham, AL
--
Birmingham, AL
Bid Date: Feb 11 2026
Birmingham, AL
Bid Date: Jan 26 2026
Birmingham, AL
Bid Date: Feb 13 2026
Birmingham, AL
Bid Date: Feb 27 2026
Birmingham, AL
Bid Date: Jan 21 2026
Birmingham, AL
Bid Date: Jan 23 2026
Birmingham, AL
--
Birmingham, AL
Bid Date: Jan 21 2026
Birmingham, AL
--
Birmingham, AL
Bid Date: Feb 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
