BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Renovation of a mixed-use development in Cheyenne, Wyoming. Completed plans call for the renovation of a educational facility; and theater / auditorium.

Central, East and South High Schools Gyms: Replacement of existing interior light fixtures and components with controllable LED lighting with impact resistant lenses, to meet current energy code requirements. East High School Auditorium: Replacement of existing interior lighting with controllable LED lighting and components, to provide better egress pathways, and integration with the buildings existing fire alarm systems to meet current energy and building codes. Questions Regarding Clarification or Interpretation of the Bid Documents Shall Be Addressed in Writing To: St+b Engineering 5920 Yellowstone Rd, Suite #2 Cheyenne, Wy 82009 307-259-7303 Cisaacson@stb.engineering

Sub-Bidding

Educational

$600,000.00

Public - County

Renovation

10

9

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
39
Bidding Soon
416
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

June 4, 2026

Project location map

Multiple Locations, Cheyenne, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.