BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Site work and new construction of a power facility in New London, Connecticut. Completed plans call for the construction of a power facility; and for site work for a power facility.

The City seeks proposals from qualified clean energy developers for a 20-year PPA to develop, own, operate, and maintain the CRC System at the New London Community Recreation Center Property. At the end of the PPA, the developer will be responsible for decommissioning the CRC System. The City will work with the winning bidder to enter into a binding Option Agreement and apply for a NRES incentive for the CRC System. Additionally, the City seeks a bid alternate that includes virtual net metering (VNM) offtake for State, Agricultural, and Municipal Beneficial Accounts in the NRES program for up to 12,000,000 kWh, which corresponds to up to 9 MW-AC of VNM Systems in Eversource territory. The City will work with the selected bidder to enter into a binding Option Agreement and apply for a NRES incentive for the VNM Systems. Question Deadline 01/22/2026 at 4:00 PM ET RFIs must be submitted electronically Bidders may submit written questions to Joshua Montague at jmontague@newlondonct.org The general scope of services for this RFP is for a qualified solar contractor to design, engineer, construct, operate, and maintain the CRC System at the Community Recreation Center, and as a bid-alternate, design, engineer, construct, operate, and maintain VNM Systems in Eversource territory, which will participate in the NRES Program, with VNM for SAM properties, administered by Eversource. The CRC System and/or VNM Systems will provide financial benefit to the City through a PPA or other similar contractual relationship. The following sections of this RFP provides information on (A) construction requirements for the CRC System and/or the VNM Systems; (B) NRES Program requirements and the City's available beneficial accounts; and (C) insurance requirements. Proposals shall not be accepted after the Opening date and Time

Post-Bid

Solar Power Generation

$400,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
925
Active Projects
581
Bidding Soon
5,003
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

February 12, 2027

Project location map

1 Recreation Wy, New London, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.