BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work for a water / sewer project in Green Cove Springs, Florida. Completed plans call for site work for a water / sewer project.

Question Deadline 02/09/2026 at 10:00 AM ET Bidders shall submit all inquiries regarding this bid via the City e-Procurement Portal, located online Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City e-Procurement Portal Submit questions via email to Jenni Bennett (jenni.bennett@nv5.com) with NV5, Inc. Include the Project name and Financial ID number in the subject line. The Clay Street Stormwater Improvements project includes the construction of a new stormwater collection system and restoration of impacted surfaces within the project limits. Work generally consists of furnishing all labor, materials, equipment, and incidentals necessary to perform the following: Install approximately 1,500 linear feet (LF) of stormwater pipe, including required trenching, bedding, backfill, and compaction. Construct approximately 25 stormwater inlets and associated structures, connections, and appurtenances. Perform utility adjustments/relocations as required to accommodate the proposed stormwater improvements, including coordination with the City of Green Cove Springs. Replace/construct curbing as needed within disturbed areas. Perform driveway restoration/reconstruction where affected by construction activities. Complete roadway restoration, including patching and surface restoration to match existing conditions and standards. Perform right-of-way (ROW) restoration, including grading, stabilization, and restoration of disturbed areas. All work shall be completed in accordance with the approved plans and specifications, applicable standards, and permitting requirements, including traffic control and protection of existing utilities and adjacent properties Bidder agrees that time is of the essence in connection with performance, delivery, and/or the services of this contract. The construction timeline for this project is 240days for substantial completion and 270 days for final completion.

GC Bidding

Water / Sewer

$500,000.00

Public - City

Site Work

59

14

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
86
Bidding Soon
1,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

Clay St, Green Cove Springs, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.