BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2026 at 7:00 PM

Updated January 29, 2026

Site work for a playground / park / athletic field in Plainfield, Illinois. Completed plans call for site work for a playground / park / athletic field.

As of January 28, 2026, this project has not yet been awarded. The project is expected to be awarded on February 12, 2026. The Plainfield Park District is accepting bids for the 2026 Fencing Projects at various sites. Bids must be submitted in opaque sealed envelopes clearly marked with the project name and bid number. Sealed proposals will be accepted until the specified deadline, after which bids will be publicly opened and read aloud. All bids must include a bid bond or bank cashier's check for ten percent of the bid amount. The project is subject to the Illinois Prevailing Wage Act, and all workers must be paid no less than the prevailing wage. Bidders must prepare proposals accordingly and comply with all applicable laws and regulations, including equal employment opportunity requirements. Project manuals are available at no charge. The owner reserves the right to waive technicalities, accept or reject any or all bids, or accept only portions of a bid and reject the remainder. A. Description: 1. Tree Preservation 2. Removal and Demolition 3. Site Preparation 4. Seed Restoration & Seed installation 5. Chain Link Fence 6. Site Furniture 7. Limestone Screenings with Stone Base The Work for the Contract shall commence on or before March 2, 2026. Contractor shall achieve Substantial Completion on or before May 29, 2026. Please note that all work at Four Seasons must be completed before April 3, 2026 and the seasons begin. CLOW STEPHENS DOG PARK Furnish and install 5' Vinyl Clad fence for dog park area Furnish and install 5' high 10' Wide Vinyl Clad leaf gates, post, and hardware for dog park maintenance access Furnish and install Limestone Screenings 4" thick with 4" stone base, for dog park areas Furnish and install Benches Fine grade and seed areas using a seed mix FIELD #1 Furnish, install, and maintain temporary 4' fencing for tree protection Remove all specified fencing, post, backstop, footings, Benches, and Hardware. Backfill all demolished footing holes (above and below grade) Furnish and install 8' high chain-link fence with footings Furnish and install 6' high chain-link fence with footings Furnish and install 4' high chain-link fence with footings FIELD #6 Remove all specified fencing, posts, footings, Benches, and Hardware. Backfill all demolished footing holes as needed (above and below grade) Furnish and install 8' high chain-link fence with footings Furnish and install 6' high chain-link fence with footings Fine grade and seed areas that are disturbed by demolition & construction use seed mix as specified (Cover old footing locations) FIELD #2 Remove all specified fencing, posts, footings, and Hardware. Backfill all demolished footing holes as needed Fine grade and seed areas that are disturbed by demolition & construction use seed mix as specified (Cover old footing locations), cover with erosion control mulch ALTERNATE - 1: WHEATLAND OUTFIELD FENCE Furnish and install 4' high chain-link fence with footings Furnish and install foul poles ALTERNATE - 2: WHEATLAND SIDELINE FENCE Furnish and install 8' high chain-link fence with footings Fine grade and seed areas that are disturbed by demolition/construction use seed mix as specified, cover with erosion control mulch ALTERNATE - 3: FOUR SEASONS FIELD 1 OUTFIELD FENCE Remove existing outfield fence, footings and foul poles Furnish and install 8' high chain-link fence with footings Furnish and install foul poles ALTERNATE - 4: FOUR SEASONS FIELD 5 SIDELINE FENCE ALTERNATE - 5: CLOW STEPHENS FENCE DEMOLITION Question Deadline 01/20/2026 Bidder must submit a written request for interpretation thereof not later than five (5) business days prior to opening of bids to the Park District. Locations- Clow Stephens - 16612 S Lily Cache Rd, Plainfield, IL 60586 Four Seasons - 22500 Lockport St, Plainfield, IL 60544 Wheatland Park - 23830 W 127th St, Plainfield, IL 60585

Bid Results

Playgrounds / Parks / Athletic Fields

$150,242.00

Public - City

Site Work

17

7

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
795
Active Projects
542
Bidding Soon
3,742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

March 2, 2026

Project location map

Multiple Locations, Plainfield, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.