BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2026 at 7:00 PM

Updated January 22, 2026

Site work and paving for a sidewalk / parking lot in Madison, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

All potential bidders must be certified by doa prior to submitting bids on state construction projects over $100,000. This project is being let using the single prime bidding and contracting process. Dfd will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (mep) divisions of work first. Within 5 days of the mep bid opening, dfd will identify a lowest, qualified, responsible, certified bidder in each applicable mep division of work. These successful mep bids must be included in all general prime contractor bids received. No later than 5 days after dfd identifies the successful mep bids, dfd will publicly open general prime contractor bids. General prime contractor bids that do not include the successful mep bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful mep bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, dfd will bid one bid package for all work to general prime contractors. In general, the work consists of: asphalt pavement replacement of six parking lots located around the university of wisconsin-madison campus. The improvements include, but are not limited to asphalt pavement replacement, concrete pavement installation and spot curb and gutter replacement. Base bid will be received for: a single lump sum bid for all work. Bid guarantee in the amount of 10% of the bid must accompany each bid submitted The 2017-2019 wisconsin state budget (2017 wisconsin act 59) repealed wisconsin's prevailing wage laws. Effective september 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after september 23, 2017. This change does not affect the federal davis bacon act requirements. The application of the 5% permissive bidding preference pursuant to wis. Stat. 16.855(10m)(am)3. For certified minority businesses is currently paused. Event bid date notes : hand delivery to the drop box labeled sealed bids only in front of the state of wisconsin administration building located at 101 east wilson street, madison, wisconsin 53703. online Bid Opening :- on the day of the bid to hear the bid results announced on the day bids are due. The conference line will be open at 1:45 P.M. CDT and all bids will be opened after 2:00 P.M. CDT MBE (9%), WBE (9%) Project must be completed before August 25, 2026.

GC Bidding

Sidewalks / Parking Lot

$600,000.00

Public - State/Provincial

Paving, Site Work

21

13

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
244
Bidding Soon
1,744
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

June 1, 2026

Project location map

To be determined, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.