Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
Renovation of a mixed-use development in Durham, North Carolina. Conceptual plans call for the renovation of a medical facility.
Provide professional Architect/Engineer (A/E) and healthcare planning services to renovate and relocate existing restrooms and locker rooms throughout Building 1 and Building 23 at the Durham VA Medical Center to ensure compliance with ADA accessibility standards. The A/E shall conduct a comprehensive study of all restrooms in these buildings and design upgrades to meet current VA ADA requirements. At a minimum, two patient and public restrooms or locker rooms per floor in each building must be fully compliant. Additional tasks include installing grab bars where required, insulating exposed sink piping in all public and patient-use restrooms, performing asbestos sampling and air monitoring, and updating finishes such as toilet partitions. The design must also incorporate power assist hardware for restroom doors, prioritizing the 7th floor within funding limitations. The design phase must be completed within 200 calendar days from the Notice to Proceed, followed by a construction procurement period of 180 days and construction period services lasting 730 days, for a total A/E contract duration of 1,110 calendar days. **Location:** Durham VA Medical Center, 508 Fulton Street, Durham, NC 27705. The magnitude of construction for this project is currently between $2,000,000 and $5,000,000 All questions shall be submitted to michael.proctor2@va.gov no later than 3:00 p.m. Eastern Daylight Time on February 7, 2026. Construction procurement time frame: 180 days from this project design completion to project submission for construction. Construction Period Services (CPS): 730 days from construction award. Total A/E contract period: 1,110 calendar days. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Medical
$5,000,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 25, 2027
508 Fulton St, Durham, NC
Related To This Project
Durham, NC
Bid Date: Feb 04 2026
Durham, NC
Bid Date: Feb 10 2026
Durham, NC
Bid Date: Mar 17 2026
Durham, NC
Bid Date: Jan 28 2026
Durham, NC
Bid Date: Jun 12 2026
Durham, NC
Bid Date: Jan 25 2026
Durham, NC
Bid Date: Feb 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
