BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2026 at 7:00 PM

Updated February 4, 2026

Site work for a water / sewer project in Ardmore, Oklahoma. Completed plans call for site work for a water / sewer project.

The purpose of this project is to replace thirteen (13) valve actuators at the City of Ardmore's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B. The purpose of this Section is to describe the general elements of the work required to accomplish the project goals . Each Bid must be accompanied by a BID BOND payable to the OWNER for Five Percent (5%) of the total amount of the BID. A certified check may be used in lieu of a BID BOND. PERFORMANCE, MAINTENANCE AND STATUTORY PAYMENT BONDS in the amount of 100 hundred percent (100%) of the Contract Price, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within sixty (60) calendar days following the actual date of the opening thereof. The OWNER reserves the right to: change dates the bid will be considered; waive all informalities; reject any and all bids; choose whether to accept alternates, if applicable; adjust quantities; and add or omit items of work as deemed necessary to conform with budget or other constraints; and to accept that bid deemed most advantageous for value received. A. The CONTRACTOR shall furnish, install, and place into satisfactory operation actuators for the treatment unit valves listed in this SECTION, equipping each of them with new, flexible electrical conduits/connections. o (4) actuators, (1) for each of the SBR influent valves (located on the south side of each SBR unit), approximately in the east/west center of each SBR basin. SBR No. 1 influent valve SBR No. 2 influent valve SBR No. 3 influent valve SBR No. 4 influent valve o (8) actuators, (1) for each of the two SBR decant (effluent) valves (located on the south side of each SBR unit) SBR No. 1, west effluent valve SBR No. 1, east effluent valve SBR No. 2, west effluent valve SBR No. 2, east effluent valve SBR No. 3, west effluent valve SBR No. 3, east effluent valve SBR No. 4, west effluent valve SBR No. 4, east effluent valve. o (1) actuator for the influent valve for Aerobic Digester B (the East Aerobic Digester). The project site is located at the Ardmore City Wastewater Treatment Plant. Physical Address: Ardmore Wastewater Treatment Plant 3600 Sutton Road Ardmore, OK 73401 Completion- Base Bid in 240 calendar days

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

5

10

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
54
Bidding Soon
742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 5, 2026

Project location map

3600 Sutton Rd, Ardmore, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.