BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2026 at 8:00 PM

Updated March 31, 2026

Site work and paving for a road / highway in El Centro, California. Completed plans call for site work for a road / highway; and road / highway.

**As of March 30th, 2026 this project has not yet been awarded. A timeline for the award has not yet been established.** The work shall include construction of a new roadway and resurfacing of existing roadways, including installation of conventional-asphalt concrete, aggregate base, grading, monument preservation, utility cover adjustments, striping and signage, installation of medians and traffic control as described in Chapter 5 of the Caltrans Traffic Manual and the latest edition of Manual of Uniform Traffic Control Devices (California MUTCD). SITE OF WORK: The site of the WORK is located along Waterman Ave.; Bradshaw Ave. and 12 th St. within City right of way. Area of work is more specifically described on the construction plans. Question Deadline 02/09/2026 at 11:59 PM PT Online submission. or questions should then be directed to the OWNER at f_deleon@cityofelcentro.org Online Q&A : Yes . Project Duration 150 Calendar Days Bid Valid 120 Calendar Days Response Types Line Items Type of Award Lump Sum License Requirements Type A Contractor's License

Bid Results

Roads / Highways

$1,949,986.00

Public - City

Paving, Site Work

16

5

9

7

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
1
Bidding Soon
127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

April 20, 2026

Project location map

Bradshaw Ave & N 12th St, El Centro, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.