BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 6, 2026

Site work for a water / sewer project in Blackfoot, Idaho. Completed plans call for site work for a water / sewer project.

The South Broadway Sewer Improvements Project consists of installing approximately 1,150 linear feet of 10-inch and 900 linear feet of 8-inch diameter underground sanitary sewer pipeline starting near the intersection of South Broadway Street and West Walker Street and ending near the intersection of South Broadway Street and Minor Street. Four 8-inch diameter underground sanitary sewer pipelines will be installed from the mainline in South Broadway Street to service the residential and commercial units. Two 8-inch diameter underground sanitary sewer pipelines will be installed and stubbed to adjacent property owners for future connection. Approximately 2,200 linear feet of existing underground sanitary sewer pipeline will be abandoned in place due to the new improvements. South Broadway Street will be sawcut and replaced with new asphalt. All parts or work not specifically mentioned but necessary in order to provide a complete installation shall be included in the bid and shall conform to all Local, State, and Federal requirements. All bids must be signed and accompanied by evidence of authority to sign. Bids must be accompanied by Bid Security in the form of a bid bond, certified check, cashier's check, or cash in the amount of 5% of the amount of the bid proposal. Bid security may be forfeited if the successful bidder fails to enter into contract in accordance with their proposal as specified in the instructions to bidders. The Owner reserves the right to reject any or all proposals, waive any nonmaterial irregularities in the bids received, and to accept the proposal deemed most advantageous to the best interest of the Owner. Before contract award, the Owner will investigate the performance record and ability of the apparent low bidder to perform the size and type of work specified and may require the submission of additional information to evaluate qualifications.

Post-Bid

Water / Sewer

$800,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
8
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 20, 2026

Project location map

South Broadway Street between West Walker Street and Minor Street, Blackfoot, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.