BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Site work and paving for a road / highway in Sherman Township, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

8.85 mi of hot mix asphalt resurfacing, including cold milling, aggregate shoulders, butt joints and pavement markings on Atwater Road from the east village limits of Ubly to Ruth Road, Huron County. This is a Local Agency project. 3% Sbp Participation Required Net classification required for this project is 1526 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2602 044 - Hot Mix Asphalt Resurfacing, Including Cold Milling, Aggregate Shoulders, Butt Joints and Pavement Markings on Atwater Road This work consists of complying with the Department's construction management processes. The Department will manage this contract using the AASHTOWare Project Construction Materials (APCM) software. Ensure all change orders are approved using APCM. No paper documents, faxes, or other methods/media are permitted for change order approvals except as allowed by this special provision or specifically approved by the Engineer. This special provision establishes the requirements for dissemination of any public relations communications and/or products intended for an external audience pertaining to this contract. Dissemination must not be made without prior written approval from the Department's Office of Communications, and then only in accordance with explicit instructions by the Department. This includes the use of the Michigan Department of Transportation (MDOT) logo. SBP Percent Required: 3.00% Question Deadline 01/30/2026 All inquiries must be made by E-mail through the electronic proposal system at MILogin for Third Partys MDOT e-Proposal application. Telephone inquiries will not be answered. To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting. All inquiries concerning the plans and proposal for this project are to be directed to: Michael Seling MDOT-eProposal@Michigan.gov STL 32000 221235A

Award

Roads / Highways

$1,262,984.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
1
Bidding Soon
487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

April 7, 2026

Project location map

Atwater Rd, Sherman Township, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.