BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 27, 2026

Renovation of a water / sewer project in Grand Junction, Colorado. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000409700 Bid Intent Not Available The City of Grand Junction is soliciting competitive bids from qualified and interested Contractors for all labor, equipment, and materials required to demolish and remove existing steel boiler flues and furnish and install a new double-wall special gas vent system serving two (2) boilers at Persigo Wastewater Treatment plant. All dimensions and Scope of Work shall be verified by Contractors prior to submission of bids. Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - FOB Destination - FOB Pre-Paid - Insurance Required Question Deadline 01/28/2026 at 5:00 PM MT Questions are submitted online No, This Request for Quote (RFQ) is issued by the City of Grand Junction. All contact regarding this RFQ is to be directed to: Kassy Nelson; Buyer kassyh@gjcity.org Scope of Work: The contractor shall provide all labor, supervision, equipment, materials, permits, hoisting/crane services, and coordination required to complete the work. Work includes: o Demolish and remove existing steel flue system(s), including crane removal through the roof o Furnish and install a new double-wall special gas vent system from each boiler to the roof o Vent assembly shall be pre-fabricated, then crane-lifted into place through the existing roof opening o Provide all connections, supports, bracing, and apprehensions necessary for a complete and operational installation 3.3.Boiler Sequencing Requirements (Continuity of Operations): This project must be completed in a phased approach to ensure building heat/hot water service is maintained. Boiler #1 Scope (Phase 1) The contractor shall: o Take Boiler #1 offline first o Remove existing piping associated with Boiler #1 venting connection o Install new ducting/venting components as required for Boiler #1 o Ensure the building water temperature is maintained throughout the process o Boiler #1 must be restored to full operational status before any work begins on Boiler #2Boiler #2 Scope (Phase 2) After Boiler #1 is fully operational, the contractor shall: o Take Boiler #2 offline only after Boiler #1 is fully operational o Install two (2) new 45 elbows o Increase the vertical rise to improve clearance and overall appearance o Remove Boiler #2 flue via crane o Install indoor flue sections up to the offset using ladders o Final vertical section shall be lowered in by crane o Furnish and install new guide wires from the concrete roof structure to the flue piping for stabilization o Furnish and install two (2) new rain caps at the termination point, 15 feet above the finished roof

GC Bidding

Water / Sewer

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
17
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2026

March 6, 2026

Project location map

2145 River Road, Grand Junction, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.