Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2026 at 7:00 PM
Updated January 27, 2026
Renovation of a water / sewer project in Grand Junction, Colorado. Completed plans call for the renovation of a water / sewer project.
Reference Number 0000409700 Bid Intent Not Available The City of Grand Junction is soliciting competitive bids from qualified and interested Contractors for all labor, equipment, and materials required to demolish and remove existing steel boiler flues and furnish and install a new double-wall special gas vent system serving two (2) boilers at Persigo Wastewater Treatment plant. All dimensions and Scope of Work shall be verified by Contractors prior to submission of bids. Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - FOB Destination - FOB Pre-Paid - Insurance Required Question Deadline 01/28/2026 at 5:00 PM MT Questions are submitted online No, This Request for Quote (RFQ) is issued by the City of Grand Junction. All contact regarding this RFQ is to be directed to: Kassy Nelson; Buyer kassyh@gjcity.org Scope of Work: The contractor shall provide all labor, supervision, equipment, materials, permits, hoisting/crane services, and coordination required to complete the work. Work includes: o Demolish and remove existing steel flue system(s), including crane removal through the roof o Furnish and install a new double-wall special gas vent system from each boiler to the roof o Vent assembly shall be pre-fabricated, then crane-lifted into place through the existing roof opening o Provide all connections, supports, bracing, and apprehensions necessary for a complete and operational installation 3.3.Boiler Sequencing Requirements (Continuity of Operations): This project must be completed in a phased approach to ensure building heat/hot water service is maintained. Boiler #1 Scope (Phase 1) The contractor shall: o Take Boiler #1 offline first o Remove existing piping associated with Boiler #1 venting connection o Install new ducting/venting components as required for Boiler #1 o Ensure the building water temperature is maintained throughout the process o Boiler #1 must be restored to full operational status before any work begins on Boiler #2Boiler #2 Scope (Phase 2) After Boiler #1 is fully operational, the contractor shall: o Take Boiler #2 offline only after Boiler #1 is fully operational o Install two (2) new 45 elbows o Increase the vertical rise to improve clearance and overall appearance o Remove Boiler #2 flue via crane o Install indoor flue sections up to the offset using ladders o Final vertical section shall be lowered in by crane o Furnish and install new guide wires from the concrete roof structure to the flue piping for stabilization o Furnish and install two (2) new rain caps at the termination point, 15 feet above the finished roof
GC Bidding
Water / Sewer
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2026
March 6, 2026
2145 River Road, Grand Junction, CO
Related To This Project
Grand Junction, CO
Bid Date: Jan 30 2026
Grand Junction, CO
Bid Date: Feb 13 2026
Grand Junction, CO
Bid Date: Mar 04 2026
Grand Junction, CO
Bid Date: Feb 20 2026
Grand Junction, CO
Bid Date: Feb 19 2026
Grand Junction, CO
Bid Date: Feb 09 2026
Grand Junction, CO
Bid Date: Jan 29 2026
Grand Junction, CO
Bid Date: Jan 29 2026
Grand Junction, CO
Bid Date: Feb 17 2026
Grand Junction, CO
Bid Date: Jan 28 2026
Grand Junction, CO
Bid Date: Feb 09 2026
Grand Junction, CO
Bid Date: Feb 12 2026
Grand Junction, CO
Bid Date: Feb 06 2026
Grand Junction, CO
--
Grand Junction, CO
Bid Date: Jan 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
