BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 11, 2026

Site work for a water / sewer project in Mount Pleasant, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000409638 Rehabilitation of Well #19, per bid specifications All bid proposals must be accompanied by a bid bond, bank cashier's check, bank draft, or certified check for not less than five percent (5%) of the bid price, made payable to the City of Mt. Pleasant. The City of Mt. Pleasant reserves the right to accept or reject any or all bids, to waive any irregularities in the bids, and to select the bid considered most advantageous to the City. Labor to mobilize, run a pump and well efficiency test, pull pump, demobilize, teardown and inspect pump , Well video logging Pre and Post Cleaning Pump bowl and column assembly overhaul including: wear rings, bowl bearings, machine impellers, new bowl shaft, new stainless steel lineshaft, new ss shaft sleeves, new lineshaft bearings, new ss shaft couplings, new ss head and motor shaft, blast and paint old column, re-use bearing retainers, all shop and machining labor. Pump Head overhaul complete with new packing box bearing, blast and paint per the specifications. Note: Well #19 is a vertical turbine. The motor is above ground, and the pump bowl is towards the bottom of the well. PART I - GENERAL SCOPE This specification covers well cleaning and rehabilitation, pump overhaul, pump reinstallation and start-up. 1. WORK INCLUDED a. Removal of pump motor b. Removal of pump discharge head c. Removal of all column assembly (column, lineshaft, bearing retainers, etc.) d. Removal of pump bowl e. Removal of suction pipe f. Photo log of well pre and post cleaning g. Well cleaning h. Complete pump overhaul i. Motor overhaul j. Pump discharge head overhaul k. New head/motor shaft l. Reinstallation, chlorination, start-up and testing of pump m. Collection of two bacteria samples, 24 hours apart and all lab submittals & fees n. Re-chlorination if required shall be performed at no additional cost and two consecutive samples for bacteria must be achieved before considering the project complete. Contractor may begin the project as early as March 31, 2026, and must complete the entire project no later than June 5, 2026

Bid Results

Water / Sewer

$99,631.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
1
Bidding Soon
981
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 31, 2026

Project location map

Multiple Locations, Mount Pleasant, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.