BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Renovation of a water / sewer project in Crystal Lake, Illinois. Working plans call for the renovation of a water / sewer project.

**As of March 5th, 2026, bids were cancelled. No definite date for the rebid.** Scope: 1. This Section establishes the procedures to be used relative to the transmission or exchange of Electronic Data for the Project. 2. Owner and Contractor agree to incorporate this Section by reference into any other agreement for construction or services for the Project. Follow GC 7.06. Scope: 1. Contractor shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions, and this Section. 2. Provide submittals well in advance of need for the material or equipment, or procedure (as applicable), in the Work and with ample time required for delivery of material or equipment and to implement procedures following Engineer's approval or acceptance of the associated submittal. Work covered by a submittal will not be included in progress payments until approval or acceptance of related submittals has been obtained in accordance with the Contract Documents. 3. Contractor is responsible to confirm dimensions at the Site, make necessary corrections, for information pertaining solely to the fabrication processes and to techniques of construction, and for coordinating the work of all trades. Contractor's signature on submittal's stamp and letter of transmittal shall be Contractor's representation that Contractor has met his obligations under the Contract Documents relative to that submittal.

Final Planning

Water / Sewer

$400,000.00

Public - City

Renovation

20

21

4

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
4
Bidding Soon
2,958
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

September 4, 2026

Project location map

Multiple Locations, Crystal Lake, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.