Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
Site work for a water / sewer project in Bowling Green, Ohio. Completed plans call for site work for a water / sewer project.
Furnishing all labor, materials, and equipment necessary for the Hammer Road Ditch No. 2488 Improvements, Perry Township, Wood County, Ohio. All waste materials generated from this project must be taken to the Wood County Landfill for disposal. Instructions to bidders include submitting electronic bids via the Wood County Engineer's Bid Express Site or sealed and clearly marked bids to the Office of the Wood County Board of Commissioners. All bidding documents, proposal sheets, plans, and specifications are available on the Wood County Engineer's Website via a link to the Bid Express Site. Requests for information and questions must be emailed to the Wood County Ditch Construction Coordinator by the specified deadline. Contractors must subscribe to the Wood County Website to receive addenda. The estimate of probable costs for the Project is $95,773.25 (ninety-five thousand seven hundred seventy-three dollars and twenty-five cents) Question Deadline 01/28/2026 at 2:00 PM ET All Request for Information (RFI) and questions shall be emailed to the Wood County Ditch Construction Coordinator, Mr. Jonathon Shinew at: jshinew@woodcountyohio.gov Mr. Jonathon Shinew Ditch Construction Coordinator Wood County Engineer's Office One Courthouse Square Bowling Green, OH 43402 Fax: 419-354-1409 Email: jshinew@woodcountyohio.gov Completion- August 7, 2026. 30" CCP Conduit Cleaning - Bowling , 36" CPP Conduit Cleaning - Bowling ,Rock Excavation and Disposal (if needed), Excavation - Spoils Leveled Per Plan, Rock Channel Protection, Type C or D, Without Filter, 4" Conduit, Type E, 6" Conduit, Type E , 10" Conduit, Type E, Maintaining Traffic, Trees, Brush, Stumps Removed and Piled, Trees, Brush, Stumps Removed and Hauled from Site, 36" Structure Removed and Replaced with 60" Type E Conduit - Babcock, 48" x 76" RCP Conduit Cleaning - Perry Township job No- 2488
Post-Bid
Water / Sewer
$95,773.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2026
March 6, 2026
Hammer Road, Bowling Green, OH
Related To This Project
Bowling Green, OH
Bid Date: Feb 13 2026
Bowling Green, OH
Bid Date: Feb 05 2026
Bowling Green, OH
Bid Date: Feb 17 2026
Bowling Green, OH
Bid Date: Feb 20 2026
Bowling Green, OH
Bid Date: Feb 12 2026
Bowling Green, OH
Bid Date: Feb 19 2026
Bowling Green, OH
Bid Date: Feb 19 2026
Bowling Green, OH
Bid Date: Feb 05 2026
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Jan 29 2026
Bowling Green, OH
Bid Date: Jan 22 2026
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Jan 29 2026
Bowling Green, OH
Bid Date: Dec 31 2025
Bowling Green, OH
Bid Date: Jan 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
