Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 17, 2026 at 7:00 PM
Updated February 18, 2026
Site work for a water / sewer project in Bowling Green, Ohio. Completed plans call for site work for a water / sewer project.
Village of Portage Ditch No. 2489 Improvements, Portage Township, Wood County, Ohio. Improvement of existing ditch starting on the West side of SR 25, continuing east for 0.89 mi and terminating on the east side of County Home Road, where it outlets into the North Branch of the Portage River. Electronic bids via the Wood County Engineer's Bid Express Site as well as sealed and clearly marked bids will be received at the Office of the Wood County Board of Commissioners for furnishing all labor, materials, and equipment necessary for the Village of Portage Ditch No. 2489 Improvements, Portage Township, Wood County, Ohio. All waste materials generated from this project must be taken to the Wood County Landfill for disposal. The estimate of probable costs for the Project is $48,259.40 Q/A:- All Request for Information (RFI) and questions shall be emailed to the Wood County Ditch Construction Coordinator, Mr. Jonathon Shinew at: jshinew@woodcountyohio.gov by: 2:00 P. M., January 28, 2026. Wood County Engineer's Office One Courthouse SquareBowling Green, OH 43402 Fax: 419-354-1409 Email: jshinew@woodcountyohio.gov Completion- August 7, 2026 Excavation Per Plan 4,495 Foot 203 Excavation - Spoils Leveled Per Plan 1,353 Cu.Yd. 203 Rock Excavation (if needed) 60 Cu.Yd. 659 Slope Seeding 5,699 Sq.Yd. 5659 Seeded Berm 9,990 Sq.Yd. 601 Rock Channel Protection, Type C or D, Without Filter 611 4" Conduit, Type E 80 Foot 611 6" Conduit, Type E 20 Foot 611 18" Conduit, Type E 40 Foot Special 4" Animal Guard 6 Each Special 6" Animal Guard 2 Each Special 8" Animal Guard 2 Each Special Clean Enclosure Under Ditch 1,410 Foot 614 Maintaining Traffic 1 Lump Sum 24 Mobilization 1 Lump Sum 103.05 Contract Bond 1 Lump Sum 201 Trees, Brush, Stumps Removed and Piled 1 Lump Sum Remove Existing 24'-1.5 ft x 2 ft Drive/Structure - Canterbury 19 Special 18" CPP Conduit Cleaning-ODOT 119 Foot 24" SMP Conduit Cleaning- New York Central Railroad 21 Special 3 Sided Culvert Cleaning- Canterbury 14 Foot 33" RCP Conduit Cleaning - Portage Township
Award
Water / Sewer
$29,954.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2026
March 6, 2026
To be determined, Bowling Green, OH
Related To This Project
Bowling Green, OH
Bid Date: Feb 13 2026
Bowling Green, OH
Bid Date: Feb 05 2026
Bowling Green, OH
Bid Date: Feb 17 2026
Bowling Green, OH
Bid Date: Feb 20 2026
Bowling Green, OH
Bid Date: Feb 12 2026
Bowling Green, OH
Bid Date: Feb 19 2026
Bowling Green, OH
Bid Date: Feb 19 2026
Bowling Green, OH
Bid Date: Mar 05 2026
Bowling Green, OH
Bid Date: Feb 05 2026
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Jan 29 2026
Bowling Green, OH
Bid Date: Jan 22 2026
Bowling Green, OH
Bid Date: Jan 29 2026
Bowling Green, OH
Bid Date: Dec 31 2025
Bowling Green, OH
Bid Date: Jan 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
