Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work for a playground / park / athletic field in Eugene, Oregon. Completed plans call for site work for a playground / park / athletic field.

Delta Ponds Trail Extension - Vegetation Enhancement Project: Delta Ponds Trail Extension - Vegetation Enhancement. Work includes: 1 LS Mobilization; 1 LS Temporary Work Zone Traffic Control, Complete; 1 FA Plants, Material Only; 27 Each Trees, 1" Caliper - Install Only; 8 Each Trees, 5-6' - Install Only; 9 Each Trees, 3/4" Caliper - Install Only; 13 Each Trees, 36-48" - Install Only; 240 Each Plants, 2 Gallon - Install Only; 650 Each Plants, 18-24" Bare Root - Install Only; 850 Each Plants, 12-18" Bare Root - Install Only; 1,400 Each Plants, Plug - Install Only; 157 CY Mulch; 57 Each Wildlife Protection Fencing; 1 LS Watering Mobilization; 25 Each Plant Establishment Visit. All planting work must be completed by April 3, 2026 per special provision 00180.50(H). Plans and specifications may be obtained online from the Oregonbuys website. The agency reserves the right to issue addenda making changes or corrections to the plans, specifications, or quantities. Addenda will only be published on the Oregonbuys website. No additional notification of addendum issuance will be provided. Submit bids to Doug Singer, Interim City Engineer. A bid guaranty is not required for this project. Filing of a qualification questionnaire before bidding will not be required. Contingent or conditional bids will not be considered for acceptance. No bid will be received or considered unless the bid contains a statement by the bidder that provisions of ORS 279C.800 to 279C.870 are met. This project is a public works improvement project and is subject to ORS 279C.800 to 279C.870. Bidders are required to submit a First-tier Subcontractor Disclosure Form, substantially as described in ORS 279C.370, within two working hours of the bid closing date and time. No bid will be accepted by the city unless it contains a statement by the bidder as part of the bid that the bidder, in carrying out the contract, will comply with all applicable laws. The City of Eugene is an equal employment opportunity and affirmative action employer. The policy is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable federal and state laws, rules, and regulations. The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or waive any specification or requirement upon a finding of the City that it is in the public interest to do so. The estimated project cost range is $75,000 - $125,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$125,000.00

Public - City

Site Work

11

5

5

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
31
Bidding Soon
299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 5, 2026

Project location map

To be determined, Eugene, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.