BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 21, 2026 at 7:00 PM

Updated January 22, 2026

Renovation of a mixed-use development in Washington, District of Columbia. Conceptual plans call for the renovation of a medical facility.

Furnish and install two Mitsubishi ductless split HVAC systems to provide dedicated climate control in two medication rooms located in the nursing home ward. Work includes conducting a pre-installation site visit to assess existing conditions, verifying electrical capacity and structural suitability, and providing equipment with cooling and heating capabilities, minimum SEER rating, indoor ceiling-mounted air handlers, outdoor condenser units installed on the roof, thermostat interface with the building management system, and appropriate BTU ratings based on room size and load calculations. Installation requires mounting indoor units, installing outdoor units with proper clearances, running refrigerant lines, electrical wiring, and condensate drain lines per code, sealing wall penetrations, and restoring finishes. Electrical work includes providing dedicated circuits, installing disconnects and breakers, and coordinating power shutdowns. Testing and commissioning involve system startup, verifying temperature control, airflow, and drainage, and training facility staff on operation and maintenance. Documentation deliverables include equipment manuals, warranty information, maintenance guidelines, and as-built drawings. Contractor must be a licensed HVAC professional experienced in healthcare facilities, comply with infection control protocols, provide background checks, and adhere to VA standards including PPE and containment measures. Location: Community Living Centers Wing H and K Ward - Washington DC Department of Veterans Affairs Medical Center, 50 Irving Street NW, Washington, DC 20422 The Method of Contractor Selection has not been determined at this Time.

Conceptual

Medical

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
486
Active Projects
192
Bidding Soon
3,286
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

Project location map

50 Irving St NW, Washington, DC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.