BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a clubhouse / community center in Cortez, Colorado. Completed plans call for the renovation of a clubhouse / community center.

As of April 20, 2026 project was awarded to PRQ Top Line,LLC, awarded amount is $426,971.96 Reference Number 0000410078 The City of Cortez is soliciting bids for roofing improvements at the Service Center Building located at 110 W. Progress Circle, Cortez, CO 81321, in accordance with the Plans and Specifications. Bidders shall submit pricing for both of the following options: (1) a roof overlay consisting of furnishing and installing a new roofing system over the existing roof, and (2) a remove and replace option consisting of complete removal and disposal of the existing roof system and installation of a new roofing system. Both bid options shall include a 20-year (NDL) Manufacturer Warranty and shall consist of new coverboard, tapered insulation (minimum R-30 equivalent), 60-mil TPO membrane, coping cap metal, new roof drains, new parapet caps, new edge flashing, and all manufacturer-required sealants and accessories necessary to complete the work. Bids must include pricing for both options; bids that do not include both will not be considered. Question Deadline 02/18/2026 at 3:00 PM MT Questions are submitted online No, Date Email Questions Due to Darby Dettloff at ddettloff@cortezco.gov; cc npeterson@cortezco.gov Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The City of Cortez reserves the right to waive any formality or any informality in the process of awarding a bid. The City of Cortez reserves the right to accept any proposal, in whole or in part, and to reject any or all proposals if it be deemed in the best interest of the City to do so.

Award

Clubhouse / Community Centers

$426,972.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2026

April 27, 2026

Project location map

110 W Progress Cir, Cortez, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.