Site work and paving for a mixed-use development in Madison, Wisconsin. Working plans call for site work for a playground / park / athletic field; bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
In general, the work consists of construction or reconstruction of asphalt roads, access drives and parking lots, gravel trails, and culverts at six DNR properties in Northwest Wisconsin. The project addresses the replacement and repair of existing roads, access drives, parking lots, trails, and culverts that have reached the end of their life, causing safety hazards, equipment damage, and deterrence to public use. The additional new facilities will address existing safety hazards. The scope of work at each site includes: Interstate State Park: Replacing pavement on the main road, spot locations with rock and marsh removals under the road, installation of milled asphalt as base course, addressing drainage issues at parking areas, and culvert replacements. - Osceola Fish Hatchery: Milling and replacing HMA pavement in upland areas, installing roadbed material and new HMA pavement along the main raceway, installing subgrade improvements with subsurface drainage, roadbed material, and HMA pavement in the lowland loading zone, and adding extra turning and staging as indicated in the plans. - Willow River State Park: Constructing an additional entrance lane, a raised curb and gutter median, and installing an additional shelter for staff to check/sell park passes. - Red Cedar River Trail: Replacing timber cross culverts with standard HDPE culverts, addressing a segment of trail with culvert crossing and regular washouts, and removing a timber structure. - Chippewa River State Trail: Pulverizing and relaying existing trail surface, adding 3 limestone shavings, relocating approximately 5,800 LF of trail, adding signing to alert trail users of new trail route, and adding drainage culverts as needed.- Lake Wissota State Park: Installing an ADA compliant trail adjacent to the main park road. Question Deadline 02/20/2026: No verbal explanation or instructions will be given in regard to the meaning of the drawings or specifications during the bid period. Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least ten (10) days before MEP bidding commences. Tender has been cancelled. When the project will be re-tendered is undetermined at this time.
Final Planning
Bridges / Tunnels
$3,650,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2026
August 3, 2026
Multiple Locations, Madison, WI
Related To This Project
Madison, WI
Bid Date: Feb 26 2026
Madison, WI
Bid Date: Feb 23 2026
Madison, WI
Bid Date: Feb 23 2026
Madison, WI
--
Madison, WI
--
Madison, WI
Bid Date: Mar 03 2026
Madison, WI
Bid Date: Feb 23 2026
Madison, WI
--
Madison, WI
--
Madison, WI
--
Madison, WI
--
Madison, WI
Bid Date: Mar 12 2026
Madison, WI
Bid Date: Mar 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.