Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 11, 2026

Site work and new construction of a detention facility in Orange, California. Working plans call for the construction of a detention facility.

TIMELINE: As of October 5, 2026, a design/build firm has been selected. Phase I is underway. The exact timelines of Phases II and III are yet to be determined, but it is anticipated that neither phase would have a duration longer than Phase I. Attempts to obtain more information is underway. The County of Orange is requesting Statements of Qualifications from interested and qualified firms to provide design and construction services for the Juvenile Hall Redevelopment Phase II project, to be delivered via Progressive Design-build. Respondents must satisfy the definition of a Design-build Entity (DBE) as defined in Public Contract Code §22185(C) and must serve as either a B-licensed general contractor or a lead design firm ("designer-in-charge") or a joint venture of both. The DBE shall act as the prime contracting entity, clearly identified in the Statement of Qualifications. If the respondent can only perform one function (general contractor or lead design firm), the other function must be identified and subcontracted. Additional engineers, design firms, or special consultants may be included as members of the Design-build Team. Firms may only submit or participate in one solicitation for the Juvenile Hall Redevelopment Phase II project; violation will result in automatic disqualification from both solicitations.Question Deadline 02/13/2026 at 2:00 PM PT *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Pre-Construction/Negotiated

Jails / Prisons

$25,000,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
690
Active Projects
294
Bidding Soon
4,612
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

May 3, 2027

Project location map

331 The City Dr S, Orange, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed