Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Site work and paving for a road / highway in Saint Charles, Missouri. Completed plans call for site work for a road / highway.

The work includes the removal and disposal of trees, shrubs, and plants along approximately 0.9 miles of Hopewell Road and 0.4 miles of Duello Road. The project covers all work associated with clearing trees, shrubs, and plants from the Hopewell Road and Duello Road right-of-way and temporary construction easements acquired for future road construction projects. Clearing involves removing all trees, shrubs, and plants within the construction limits, unless specifically noted to remain in place. Incidentals include the removal and replacement of any fences as necessary to complete the work, as well as re-vegetation of any disturbed areas. Work must be performed using specified traffic control measures. All bidders must meet MoDOT requirements as a CONTRACTOR at least seven days before the bid opening, in accordance with Section 102.2 of the St. Charles County Standard Specifications for Arterial Highway Construction. All labor must be paid no less than the prevailing hourly wage rate established by the state. The DBE goal is a minimum of 0% of the total contract amount. Bidders will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. The DBE goal for this letting is a minimum of 0% of the total contract amount. All trees, branches, and shrubs larger than three (3) inches in diameter must be felled by March 31, 2026. Removal of the tree debris can extend into April 2026. With the rate of progress and the time of completion being essential conditions of this contract, liquidated damages will be charged for failure to complete tree felling by March 31st as well as for overall project within the allotted time at the rate of three hundred ($300.00) dollars per day for each working day Q/A:- Question Deadline 01/27/2026 No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. All questions concerning the bid document preparation or Project Specific questions can be directed to Chris Bostic with St. Charles County Highway Department in writing at 301 N.3rd Street, St. Charles, MO 63301, or by email (preferred) at cbostic@sccmo.org. All questions must be received at least one week prior to Bid Opening to ensure a response.

Award

Roads / Highways

$50,000.00

Public - County

Paving, Site Work

23

5

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
0
Bidding Soon
788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 2, 2026

Project location map

Multiple Locations, Saint Charles, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.