Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

Renovation of an educational facility in Saint Louis, Missouri. Completed plans call for the renovation of a educational facility.

The work shall be completed by a qualified mechanical contractor who shall submit a turnkey proposal for the Design/Build F.A. work for retrofit systems installation work at Point Elementary School as specified and as required by code. Only Design-Build contractors meeting the requirements within the specifications will be considered as qualified bidders. Bidders must provide, with the bid, a Bid Bond in the amount of 5% of the proposed contract sum. No cashier checks allowed. All Bidders whose bids are in excess of $5,000.00 must provide with their bid the Federal Work Authorization Program ("FWAP") Affidavit of Compliance and Verification Form with respect to employees working in connection with the contracted services, affirming enrollment in a FWAP. bid date- and mailed or delivered to Mehlville School District, Facilities / Operations Office Building, 69 Randolph Place, St. Louis, MO 63125. Any Bid received after above-stated closing time will not be accepted and will be returned unopened Should a Bidder find discrepancies in, or omission from, drawings or other documents, or should he be in doubt as to their meaning, he/she shall immediately notify in writing: Facility Solutions Group 901 Horan Drive, Suite 100 Fenton, MO 63026 Attn: Mr. Dan Childress dchildress@fsg-stl.com who will send written instructions to all Bidders. All written requests must be received no later than three (3) days prior to the published bid due date A. A new intelligent reporting, microprocessor controlled fire detection system shall be installed in accordance with the specifications and drawings. B. The system shall be designed such that each signaling line circuit (SLC) is limited to only 75% of its total capacity at initial installation. C. The system shall be designed such that each Notification Appliance Circuit (NAC) is limited to only 80% of the maximum current draw allowed as calculated using the UL 9th Edition formula.

Award

Educational

$157,432.00

Public - City

Renovation

13

6

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
93
Bidding Soon
1,609
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

May 26, 2026

Project location map

6790 Telegraph Rd, Saint Louis, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed