Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Site work for a bridge / tunnel in Joliet, Illinois. Completed plans call for site work for a bridge / tunnel.

Repair bank erosion north side of Ring Road at bridge. All contracts for the construction of public works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). Joliet Junior College reserves the right to reject any or all bids or to accept any bid which may be in the best interests of the college. The site is open to the public and can be visited at any time. Questions should be submitted through ESM Solutions Questions for addendum due by end of day on Monday, February 2 The purpose of this project is to repair, stabilize, and protect a section of the roadway embankment along the Joliet Junior College (JJC) Ring Road that has experienced progressive erosion due to stormwater runoff, soil displacement, and long-term slope degradation. The affected area has shown signs of sloughing, loss of soil mass, undercutting at the toe of the slope, and encroachment toward the roadway shoulder, creating a potential hazard to the structural integrity of the pavement and the safety of campus vehicular traffic. This project consists of removing unstable soils, reconstructing the embankment, and installing a long-term stabilization system designed to prevent future erosion and protect the roadway infrastructure. The Base Bid requires installation of a fully engineered retaining wall system to rebuild and reinforce the slope. An Alternate Bid is included for a gabion basket and riprap stabilization system, allowing the Owner to evaluate cost and performance options. The work includes, but is not limited to: o Excavation and removal of loose, unstable, or eroded soils along the bank. o Regrading the slope to achieve proper geometry for stabilization. o Installation of geotextile fabric to prevent soil migration. o Base Bid: Construction of a retaining wall system including wall units, drainage stone, geogrid reinforcement, and backfill. o Alternate Bid (add or deduct to base bid): Placement and construction of gabion baskets and riprap armoring. o Restoration of the roadway shoulder, drainage patterns, and adjacent disturbed areas. o Installation and maintenance of erosion control measures throughout construction. o Traffic control and site protection to maintain safe campus operations. The completed project will restore the structural stability of the Ring Road embankment, protect the roadway from further erosion, improve long-term drainage performance, and ensure safe vehicular access around the campus. All work shall be performed in accordance with the project drawings, specifications, and this detailed Scope of Work

Bid Results

Bridges / Tunnels

$127,741.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
2
Bidding Soon
2,101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

May 18, 2026

Project location map

Ring Rd, Joliet, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.