BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Site work for a water / sewer project in Alba, Texas. Completed plans call for site work for a water / sewer project.

Project will include, but not limited to the following: Install new coating systems on the interior and exterior surfaces of the existing ground storage tank and miscellaneous repairs. Overview The existing ground storage tank at the TX-182 plant is in need of repair in accordance with the TCEQ Chapter 290 Rules and Regulations. To achieve this objective, this contract provides for the following sequence of events. 1. The Contractor shall sandblast and install new interior coating system on all interior surfaces and appurtenances of the existing ground storage tank. 2. The Contractor shall sandblast and install new exterior coating system on all exterior surfaces and appurtenances of the existing ground storage tank. 3. The Contractor shall demolish the existing 30” roof access hatch and install a new hatch. 4. The Contractor shall demolish the existing 12” roof vent and install a new mushroom style vent with mesh. 5. The Contractor shall demolish and remove the existing electrical junction box and exterior wall-mounted level gauge and patch holes with new steel plate. 6. The Contractor shall repair by welding the existing roof plate lapping. 7. The Contractor shall install a new gasket on the new roof access hatch. 8. The Contractor shall disinfect the tank after adequate time has elapsed once the interior coating system has cured in accordance with the Manufacturer’s specifications. Bid Security, Performance and Payment Bonds shall be as set forth in the INSTRUCTIONS FOR BIDDERS. Bright Star-Salem SUD reserves the right to reject any or all bids and to waive any formalities. No Bidder may withdraw his bid within 60 days after the actual bid opening date. Any questions about the meaning or intent of the Contract Documents are to be directed to ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER having received the Bidding Documents. Questions received less than 10 days prior to the date for opening of bids may not be answered. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or ENGINEER.

Bid Results

Water / Sewer

$109,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
123
Bidding Soon
2,377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 5, 2026

Project location map

7385 TX-182, Alba, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.