Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a water / sewer project in Telluride, Colorado. Working plans call for the renovation of a water / sewer project.

As of April 29, 2026, no bids were received. No definite date for the rebid. This project includes the removal of existing gaseous chlorine and batch day tank chlorination systems and the installation of a new calcium hypochlorite tablet feeder system at the Mill Creek Water Treatment Plant (MCWTP), located in a high-alpine environment serving the Town of Telluride. MCWTP is a 1-mgd drinking water treatment facility utilizing conventional pretreatment followed by membrane filtration. The facility operates under two CDPHE-approved disinfection segments. Segment 1 - Pretreatment Segment 2 - Clearwell The existing chlorination systems rely on gaseous chlorine and batch chemical preparation within an enclosed chlorine room. The Town intends to convert to an AccuTab-style (Westlake Water Systems) tablet feeder system to improve operator safety, system reliability, chemical handling, and winter accessibility. This project is being implemented in accordance with CDPHE, WQ-DW-Policy-DW005- 2024 Design Criteria Policy for Potable Water Systems and has been approved for construction based on a design submittal of drawings and a Basis of Design Report (BODR). Reference Number 0000410290 Bid Intent Not Available This project includes the removal of existing gaseous chlorine and batch day tank chlorination systems and the installation of a new calcium hypochlorite tablet feeder system at the Mill Creek Water Treatment Plant (MCWTP), located in a high-alpine environment serving the Town of Telluride. MCWTP is a 1-mgd drinking water treatment facility utilizing conventional pretreatment followed by membrane filtration. The facility operates under two CDPHE-approved disinfection segments: Segment 1 - Pretreatment Segment 2 - Clearwell The existing chlorination systems rely on gaseous chlorine and batch chemical preparation within an enclosed chlorine room. The Town intends to convert to an AccuTab-style (Westlake Water Systems) tablet feeder system to improve operator safety, system reliability, chemical handling, and winter accessibility. This project is being implemented in accordance with CDPHE, WQ-DW-Policy-DW005- 2024 Design Criteria Policy for Potable Water Systems and has been approved for construction based on a design submittal of drawings and a Basis of Design Report (BODR). Mill Creek Water Treatment Plant is the primary treatment plant for the Town of Telluride and therefore the time the plant is offline for construction must be minimized. The Contractor will coordinate all down-time with the Town. Start-up of the chlorine system bust be completed by Monday, May 25th, 2026 (Memorial Day). The Town has engaged a design consultant for the preparation of the design, construction services, and preparation of the asbuilts. The Town's electrical and controls consultant was engaged in the design and will be executing the integration of the chlorine system into the existing SCADA. The Town has design consultant (KMS) and electrical controls consultant (SKM) that will require coordination. Award of Contract: March 4th, 2026 o Notice to Proceed: March 11th, 2026 o Substantial Completion: July 1st, 2026. 16 Weeks/112 Days (Expected Completion Time) o Final Completion: July 17th, 2026 Question Deadline 02/13/2026 at 3:00 PM MT Questions are submitted online No The Town of Telluride is soliciting sealed proposals from qualified vendors for the Telluride Mill Creek Water Treatment Plant Chlorine Conversion Project. The Town will accept proposals via email but will not accept proposals via fax. If a hardcopy is submitted, please provide two (2) copies sealed in a manila envelope clearly marked as a proposal for this project and to the attention of Connor Tyrrell, Capital Improvement Project Manager. Buyer Preferences, Guidelines & Requirements General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required - Material Safety Data Sheets Required - Onsite Maintenance Required - Safety Standards Plan Bonding Requirements Buyer Requires E-Bonding - Bid Bond 5 % - Performance Bond 5 % The Town of Telluride reserves the right to reject any or all Proposals, in part or in whole, or to waive any informalities or technicalities in this Request for Proposal if it is deemed to be in the best interest of the Town to do so.

Final Planning

Water / Sewer

$200,000.00

Public - City

Renovation

13

6

3

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
20
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

October 29, 2026

Project location map

Multiple Locations, Telluride, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.