Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 20, 2026 at 7:00 PM
Updated February 21, 2026
Site work and renovation of a mixed-use development in Yonkers, New York. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.
Reference Number 0000410166 Phase 3 of 3 - Windows, Masonry, Interior Iprovements and Site Work at Family School 32 - Multi Prime Construction Contract: General Construction; Hvac; Plumbing; Electric Question Acceptance Deadline 02/09/2026 02:00 PM EST Questions are submitted online No General Requirements - Certified Payroll - Contractors License Required - FOB Destination - Installation Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % CONTRACT DESCRIPTION Contract Type: Multiple contracts are separate contracts, representing significant construction activities, between Owner and separate contractors. Each contract is performed concurrently and coordinated closely with construction activities performed on Project under other contracts. Contracts for this Project include the following General Construction- Building - Contract No. 1 . HVAC Construction - Contract No. 2. Electrical Construction - Contract No. 3. Plumbing Construction - Contract No.4 The work of each Contractor is identified in this Project Manual and on the Drawings. Local custom and trade-union jurisdictional settlements do not control the scope ofWork included in each prime contract. When a potential jurisdictional dispute or similar interruption ofwork is first identified or threatened, the affected contractor(s) shall promptly negotiate a reasonable settlement to avoid or minimize the pending interruption and delays. Ifit becomes necessary to refer to the contract documents to determine which prime Contract includes a specific element ofrequired work, begin by referring to the prime Contracts, themselves; then, if a determination cannot be made from the prime Contracts, refer, in the following order, to the Supplementary Conditions, if any, this section ofthe Specifications, followed by the other Division-1 sections and finally with the Drawings and other Sections ofthe Specifications. If, after referring to the contract documents, it cannot be clearly determined which prime Contractor will perform a specific item ofrequired work, then, that item ofwork will be brought to the YPS Office of Facilities Management and Fuller and D'Angelo, P.C. attention in writing for determination. Summary by References: Work ofthe Contract can be summarized by reference to the School Facilities Management Contract Manual And Specifications, Specification Sections, Drawings, or Addenda to Contract Documents issued subsequent to the initial printing ofthis Project Manual, and including but not necessarily limited to printed material referenced by any ofthese. It is recognized that the work ofthe Contract is unavoidably affected or influenced by governing regulations, natural phenomenon, including weather conditions, and other forces outside the contract documents.
Post-Bid
Educational
$60,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2026
March 23, 2026
1 Montclair Pl, Yonkers, NY
Related To This Project
Yonkers, NY
Bid Date: Jan 30 2026
Yonkers, NY
Bid Date: Jan 30 2026
Yonkers, NY
Bid Date: Jan 28 2026
Yonkers, NY
Bid Date: Feb 17 2026
Yonkers, NY
Bid Date: Feb 04 2026
Yonkers, NY
Bid Date: Feb 04 2026
Yonkers, NY
Bid Date: Feb 04 2026
Yonkers, NY
Bid Date: Feb 02 2026
Yonkers, NY
Bid Date: Feb 20 2026
Yonkers, NY
Bid Date: Feb 11 2026
Yonkers, NY
Bid Date: Feb 10 2026
Yonkers, NY
Bid Date: Feb 10 2026
Yonkers, NY
Bid Date: Feb 12 2026
Yonkers, NY
Bid Date: Feb 12 2026
Yonkers, NY
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
