Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 27, 2026 at 7:00 PM
Updated May 21, 2026
This is a service / maintenance or supply contract in Pleasant Hill, Iowa. Contact the soliciting agency for additional information.
Environmental Graphics & Signage Package for Des Moines University in Des Moines, Iowa is required. The work includes the fabrication and installation of vehicular, parking, and monument signage for Southeast Polk Community School District. The Signage Contractor is responsible for the quality and safety of the final product, using supplied custom artwork in digital formats. The contractor must verify that sign placements meet state and federal guidelines and align with power sources, providing written notice of discrepancies and visual proof of adjustments as needed. All signage must comply with the Americans with Disabilities Act (ADA). Bidders are required to have read and understood all Bidding Documents and addenda. All quoted costs must include completion schedules and all necessary components, including fabrication, submittals, transportation, installation, and clean-up. The work must be performed by an experienced Signage Contractor regularly engaged in similar projects. One sample section of Sign Type H2 must be submitted for review. Substitutions may be requested using a specific form at least ten days before the bid date. Any clarifications or corrections will be issued only by written Addendum. Bids must be submitted on the provided Excel form and sealed, and may be modified or withdrawn in writing before the deadline. The Owner reserves the right to reject any or all bids, waive minor irregularities, and negotiate unit prices if necessary. Shop drawings and submittals detailing materials, colors, methods, and installation must be approved before fabrication and installation. Final walkthroughs and punch-lists are required, with correction of any fabrication errors within thirty days at no additional cost. The Signage Contractor’s project manager must coordinate on-site work, examine installation conditions, and correct any issues before proceeding. Final electronic files, signage standards, specifications, location schedules, and message schedules will be provided to the awarded contractor.
Post-Bid
Sidewalks / Parking Lot
$300,000.00
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
March 28, 2026
8031 NE University Ave, Pleasant Hill, IA
Related To This Project
Pleasant Hill, IA
Bid Date: Feb 11 2026
Pleasant Hill, IA
Bid Date: Feb 04 2026
Pleasant Hill, IA
Bid Date: Mar 04 2026
Pleasant Hill, IA
Bid Date: Apr 02 2026
Pleasant Hill, IA
Bid Date: Apr 02 2026
Pleasant Hill, IA
Bid Date: Jun 16 2026
Pleasant Hill, IA
Bid Date: Feb 11 2026
Pleasant Hill, IA
Bid Date: Feb 16 2026
Pleasant Hill, IA
Bid Date: Sep 03 2025
Pleasant Hill, IA
Bid Date: Sep 25 2025
Pleasant Hill, IA
Bid Date: Apr 09 2026
Pleasant Hill, IA
Bid Date: Jul 16 2025
Pleasant Hill, IA
Bid Date: Jul 01 2025
Pleasant Hill, IA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
