Site work and paving for a road / highway in Hudson Falls, New York. Completed plans call for site work for a road / highway.

The Warren Washington Industrial Development Agency is soliciting lump-sum bids from qualified contractors for the construction and modification of an existing access road between East Street in the Village of Fort Edward and the Canalside Energy Park. The project includes replacing an approximately 600-foot single-lane roadway with a two-lane access road to provide safe ingress and egress during the planned bridge replacement on Lock 8 Way. Work includes site preparation, clearing and grubbing, grading, roadway construction, asphalt paving, guiderail and gate installation, erosion and sediment control, and site restoration. The project is subject to New York State prevailing wage requirements and will be awarded to the lowest responsible bidder. Location: Between East Street and Canalside Energy Park, Fort Edward, NY - Washington Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Contract Term: 2 months Anticipated Contract Award Date: Wednesday, February 18, 2026 Anticipated Mobilization Date: May 1, 2026 Completion Date: June 30, 2026 Please make requests for the supporting documentation to: Alie Weaver, Office Administrator Warren Washington IDA 5 Warren Street | Suite 210 Glens Falls, NY 12801 (518) 792-1312 aweaver@warren-washingtonida.com Introduction The primary access to the Canalside Energy Park property, at 470 Lock 8 Way, is south from NYS Route 196 (Kingsbury) via Lock 8 Way. Presently Washington County DPW is soliciting bids for a contractor to replace an existing bridge on Lock 8 Way. To facilitate the proposed bridge replacement, all traffic on Lock 8 Way will be disrupted forthe duration of the bridge construction. In order to provide safe continuous ingress and egress to the Canalside Energy Park property during the bridge construction, the existing access road to East Street (Fort Edward) requires improvements. All work is to be completed in accordance with the provided design/construction plans and documents, unless otherwise noted. Major Task Items for the contractor are listed as follows: (Note: The Major Task Items are listed for guidance purposes only and should not be considered a comprehensive list of all work required. Refer to provided design/construction drawings and documents for all work required to be completed). o Placement and maintenance of temporary erosion and sediment control devices and practices during the during of construction. o Site Preparation - demolition and removal of site components asidentified on the design drawings or as specified. o Clearing and grubbing of existing woody vegetation and trees. o Stripping of topsoil. o Partially removal of existing single lane access road. o Removal of existing access gate. o Modification of existing roadside guiderail near East Street. o Site grading and fill placement**. o Roadway construction to match existing and proposed grades, required construction details and specifications and appropriate best management practices. o Asphalt paving. o Lapped pavement joint at the intersection of the access road and East Street. o Installation of new guiderail. o Installation of new Access Gate. o Topsoil, seeding and mulch, as appropriate, to permanently stabilize all disturbed areas of the project site. o Work cooperatively and in conjunction with theWWIDA,WWIDA retained consultants, NYS Canal Corp., NYSDOT, Village of Fort Edward, etc. Question Deadline 02/05/2026 at 12:00 PM ET All questions must be submitted in writing/email. please contact Alie Weaver, Office Administrato r and Chuck Barton, Chief Executive Officer, via email at aweaver@warren-washingtonida.com & chuckbarton@warrenwashingtonida.com

GC Bidding

Roads / Highways

$1,000,000.00

Public - County

Paving, Site Work

15

5

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
123
Bidding Soon
1,318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

May 1, 2026

Project location map

470 Lock 8 Way, Hudson Falls, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.