BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work and paving for a road / highway in Wilson, Oklahoma. Completed plans call for site work for a road / highway; and for paving for a road / highway.

US-70: From 0.2 Miles East of the Us-77 Junction, Extend East Near Ardmore. Project Length = 6.440 Miles Question Deadline January 30, 2026 . Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org. OKDOT - 110 - Resurface (Asphalt) - US-70 FEDERAL AID PROJECT NO. STP-206C(075)CI STATE/JOB No. 34480(04) This section establishes procedures for determining acceptability and pay adjustments as they relate to smoothness requirements of pavements and bridge decks. The equipment and testing applicable to this section shall be provided and/or operated by the party or parties specified in Appendix A of this provision. Except as noted herein, these special provisions apply to all types of Portland cement and asphalt concrete pavements, as well as bridge decks constructed as part of this contract, or as specified on the plans. This provision establishes procedures for determining acceptability and pay adjustments as they relate to smoothness requirements of pavements and bridge decks. The equipment and testing applicable to this section shall be provided and/or operated by the party, or parties, specified in Appendix A of this provision. Except as noted herein, these special provisions apply to all types of Portland cement and asphalt concrete pavements, as well as bridge decks and approach slabs constructed as part of this contract, or as specified on the plans. Mainline pavement is defined as driving lanesthat are permanent. This provision will use a International Roughness Index (IRI) per segment, as determined by the latest version of the FHWA's software, ProVAL. A pavementsegment is defined as a continuous area of finished pavement, 0.1 mile in length and one (1) lane in width. A partial segment may result from an interruption of the continuous pavement surface. An Area of Localized Roughness (ALR) is a length of pavement with localized roughness that exceeds the corresponding threshold value. Localized roughness is based on a continuous IRI computed over a 25-foot distance. ALR is determined by the latest version of FHWA's software, ProVAL. This work consists of providing electronic data for material weight tickets of all bituminous material delivered to the project. This work also consists of placing an identifying vehicle number on the driver side and the passenger or rear sides of the delivery vehicle. These provisions do not preclude or dismiss any requirement for paper tickets required by the Standard Specifications or other rules and regulations. This work consists of providing and placing reflectorized and non-reflectorized plural-component pavement markings on asphalt concrete (AC) and portland cement concrete (PCC) pavement surfaces. Plural-component pavement markings includes multiple varieties of both fast setting and slow setting hybridized epoxies, modified urethanes/polyacrylates, methylmethacrylates(MMA), polyurea, or any other applicable plural-component materials approved by the Department.

GC Bidding

Roads / Highways

$2,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
100
Bidding Soon
1,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

April 13, 2026

Project location map

US-70 ALT, Wilson, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.