BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 30, 2026

This is a service / maintenance or supply contract in Sloughhouse, California. Contact the soliciting agency for additional information.

The County of Sacramento, Department of Waste Management & Recycling (DWMR) is soliciting proposals from qualified liner system installation firms to perform geosynthetic liner repair services for the County of Sacramento Kiefer Landfill facility (KLF) on an on-call basis. The KLF is located in southeastern Sacramento County at 12701 Kiefer Boulevard, Sloughhouse, California 95683 as shown on Attachment B - Site Vicinity Map. Damage to the liner system affects the integrity of this environmental barrier and shall be repaired before covering the damaged liner with waste. Due to limitations on locations for active waste placement, repairs may be of a very high priority to maintain service for the waste stream entering the landfill. As such, emergency repairs will be needed on an on-call basis to keep the landfill operation running efficiently. However, repair services will only be required if damage occurs to the landfill base liner system. The County owns and operates the KLF for the disposal of Class III municipal solid waste, servicing the residences and businesses within the County of Sacramento and nearby cities. Periodically, the KLF extends the landfill base liner system to incorporate more airspace to deposit waste. The landfill liner system is a subsurface barrier that contains waste and waste constituents from being released into the surrounding environment. The Kiefer Landfill is permitted for base liner systems in Modules M1L through M11. Module M1 (the original unlined area) was opened for waste fill operations in the summer of 1967. Module M-1L was opened for waste fill operations in March 1994 with the initial base liner system. Currently, landfilling is occurring in Module M4. Modules 5 through 11 will be constructed in the future to meet the local demand for disposal service. Since the landfill liner has been constructed in multiple phases, the liner system components and material types vary. A summary of the various liner system components is included with this request for proposals as Attachment A - Table 1 Base Liner System Components. Question Submission Deadline:May 15, 2026, 2:00pm

Post-Bid

Water / Sewer

$200,000.00

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
429
Active Projects
192
Bidding Soon
3,456
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

June 29, 2026

Project location map

12701 Kiefer Boulevard, Sloughhouse, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.