Published February 11, 2026 at 7:00 PM

Updated February 13, 2026

Site work and new construction of an educational facility in Springtown, Texas. Completed plans call for the construction of a educational facility.

(CIVIL, LANDSCAPE, ARCHITECTURAL SITE, STRUCTURE & ELECTRICAL SWITCH GEAR) CMU Concrete: 1. All concrete panels with detailed openings and penetrations 2. All rebar & dowel placements 3. Control Joints & Expansion joints Concrete Tilt Up & Structural Masonry: 1. All wall openings and clearance zones 2. Rebar around openings modeled as clearances. Bond beam and lintel regions Reinforcing and embed regions. Jam regions Structural Steel: 1. All columns, baseplates, anchor bolts and accessories 2. Correct depth and location of all beams and joist (with joist spacing modeled to actual conditions). 3. All bracing, stiffeners, and connections necessary for fabrication and installation 4. Accurate embed size and location. Metal Stud Framing: 1. All Framing: King Studs, Corner Studs, Headers, Kickers & Openings. 2. All Critical stud clearances to be shown. HVAC Ductwork: 1. All HVAC Families & Systems will be modeled and named with the correct "System Names" per their properties/layers i.e. (VAV, SAV, FCU, AHU, Supply Air, Return Air etc.) 2. All ducts and related accessories, including but not limited to dampers, VAV boxes, and diffusers. Ducts should be modeled to outside diameter and when it exists, duct insulation around the outside of the ducts shall be modeled. Model all flanges, hangers, and bracing, etc. 3. Model all HVAC equipment. Each piece should be modeled to its overall height, width, and depth. In the event the detailed piece of equipment exists from the manufacture use that 3D item. All equipment should be modeled with a transparent red space for all the clearances needed for that piece of equipment. 4. All gas fired equipment vents, flu vents & intake combustion air, needs to be shown and modeled per the approved equipment manufacturer. 5. All access panels/hatches in hard lid ceilings need to be modeled and shown. 6. All units above ceilings should have a clearance zone shown at least 3" above and side of units and shown extended down to the floor. 7. All VaV's should have an access of 30"x30" or per AHJ requirements. 8. All SaV's should have an access of 24"x24" or per AHJ requirements. 9. All hangers, sleeves and penetrations will be modeled. HVAC Piping: 1. All HVAC Families & Systems will be modeled and named with the correct "System Names" per their properties/layers. 2. All piping with an outside diameter of 3/4" or greater and related accessories will be modeled and shown. All piping shall be modeled to its outside diameter or, if it exists, to the outside of pipe insulation. 3. All equipment including, but not limited to chillers, cooling towers, condensers, and pumps. Each piece shall be modeled to its overall height, width, and depth. In the event the detailed piece of equipment exists from the manufacture use that 3D item 4. All access panels, including clearance zones above and shown extended down to the floor. 5. All drip pans/trays will be modeled if needed. 6. All hanger/supports, sleeves and penetrations will be modeled. Plumbing: 1. All Plumbing Families & Systems will be modeled and named with the correct "System Names" per their properties/layers i.e. (Boiler, Pump, CHW, DCW, DHW, DHWR etc.) 2. All sloped pipe regardless of diameter will be modeled and shown (including under slab piping). Pressure pipes with outside diameter of 3/4" or larger. All related accessories. Pipes should be modeled to outside diameter or outside of the insulation if it exists. Pipe slopes shall be modeled. 3. All plumbing equipment. Each piece shall be modeled to its overall height, width, and depth. In the event the detailed piece of equipment exists from the manufacturer use that 3D item 4. Model all valves, access zones for equipment, fixtures, and clean outs. 5. All plumbing valves will be modeled no greater than 24" above ceiling with a clearance zone shown extended down to the floor. 6. All hanger/supports, sleeves and penetrations will be modeled. Electrical: 1. All Electrical Families & Systems will be modeled and named with the correct "System Names" per their properties/layers i.e. (PNL-X, MSB, SWBD-X, Disc. etc.) 2. All conduit and MC cabling 1" and larger or any two or more parallel conduits above ceiling and under slab. 3. All Electrical equipment including, but not limited to MSB's, MCC's, Panelboards, and junction/pull boxes. Each piece shall be modeled to its overall height, width, and depth. In the event the detailed piece of equipment exists from the manufacture use that 3D item

Post-Bid

Educational

$53,500,000.00

Public - City

New Construction, Site Work

192

19

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
162
Bidding Soon
3,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

March 2, 2026

Project location map

To be determined, Springtown, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.