BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work and new construction of a warehouse / distribution facility in Normal, Illinois. Completed plans call for the construction of a warehouse / distribution facility.

**As of March 13, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** Sealed bids are invited from interested and qualified parties for the construction of a storage building at 1500 West Raab Road. The project consists of constructing a post-framed storage building clad with metal roof and wall panels and provided with mechanical, plumbing, and electrical systems. Lump sum bids will be received for this project. Work requires compliance with the Illinois Prevailing Wage Act, 820 ILCS/.01 et seq. Online access to digital drawings and specifications for the bidding documents can be obtained through the Architect's website. The College reserves the right to accept or reject any and all proposals or parts thereof. Equal Opportunity Employer. Project Location: 1512 Vermillion Way, Normal, IL 61761 Project Description: Project consists of the construction of a post-framed building with metal roof and wall panels. The scope includes shallow concrete foundations, sectional overhead doors with bollards, personnel door, and trench drains with oil interceptor. Also included are water service with hose bibbs and sill cocks, gas-fired unit heaters, as well as interior and exterior lighting with lighting controls and receptacles. Pavement work will be provided as required to route sewer service connection and provide driveway for sectional overhead doors. Existing gas and electrical services between the existing physical plant building and the existing storage building shall be relocated, and the site shall be regraded and reseeded as required. Contract Time: (155) one hundred fifty-five consecutive calendar days A. Pending receipt of the Notice to Proceed, the Contractor will have access to the site no earlier than 7:00am on April 15, 2026. B. We, the undersigned bidder, will fully complete all Work by 5:00pm on September 16, 2026. Q/A:- Bidders and Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Architect at least five (5) days prior to the date for receipt of Bids. a. Email questions to Architect at aaron@design-mavens.com. Use the following subject line: HCC Physical Plant Storage Building Bid Question". Telephone (voice) queries are discouraged.

Bid Results

Warehouse / Distribution

$449,250.00

Public - County

New Construction, Site Work

27

22

20

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
16
Bidding Soon
980
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 23, 2026

Project location map

1512 Vermillion Way, Normal, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.