BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2026 at 8:00 PM

Updated March 18, 2026

Renovation of a playground / park / athletic field in Montreal, Quebec. Completed plans call for the renovation of a playground / park / athletic field.

Reference number: 20118930 Deadline for receipt of complaints 2026-02-10 There is provision for a tendering process for each tender no Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 36 The work consists primarily of providing the labour, materials, equipment, material and services required to perform the installation of the waterproofing complex for the metal roof of the Olympic Stadium. The exact scope is presented in the plans and specifications of this call for tenders. The CONTRACTOR shall in particular provide (and not limited to) manpower, documentation, equipment, machinery, scaffolding if applicable, supports, services, testing devices, materials and all accessories necessary for manufacturing, the supply, delivery, storage, installation, testing, commissioning and warranty of equipment and materials for the works described above. The work described above is not limiting. The work is more specifically defined in the documents and plans and specifications prepared by STGM and enhanced in the specific clauses of this call for tenders. It is understood that all devices or accessories necessary for a complete installation must be provided and installed even if not specifically described. The content of this article should not be considered limiting. For more details and precisions, refer to the plans and specifications and other documents forming part of this mandate. Annexes O and R (Reinforced metal roof structure plans and elevation of consoles and chutes are presented as additional information. Daily cleaning and maintenance of the construction site and access; The signage and signallers required for traffic on project sites for all handling of equipment and materials in this batch, in accordance with the master contractor's Prevention Framework Program, attached as Appendix A to this document. Coordination with the Construction Manager to obtain the storage spaces and work area required as part of the work; All the measurements necessary for the complete completion of the work in this call for tenders; The movement of workers on site to reach their workplace; The boarding and travel expenses of all workers and subcontractors; The management of noise, dust, concrete shards, paint, odours, water or any other contaminant specific to his work;

Award

Playgrounds / Parks / Athletic Fields

$17,716,556.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
3
Bidding Soon
1,825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 27, 2026

Project location map

4545 Av. Pierre-De Coubertin, Montreal, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.