Published March 10, 2026 at 8:00 PM

Updated March 11, 2026

Site work for a sidewalk / parking lot in Pueblo, Colorado. Completed plans call for site work for a sidewalk / parking lot.

In general, this project will consist of ADA curb ramp and sidewalk improvements to the 200 Block of Van Buren Street in the City of Pueblo, Colorado, as detailed in the plans and specifications for this project. In general, this project will consist of ADA curb ramp and sidewalk improvements to the 200 Block of Van Buren Street in the City of Pueblo, Colorado, as detailed in the plans and specifications for this project. Bidders shall inform themselves of the conditions of the project site and the requirements of the project's scope of work before submitting their bid. No allowances shall be made by reason of any matter or thing concerning which they might not have been fully informed prior to the bidding. No Bidder will be heard after the opening of bids to assert that there was any misunderstanding as to the nature of the operation expected in this solicitation. Downloaded plans/drawings must be printed as "Actual Size"; scaling is NOT correct when printed using other options. It is the Bidders' sole responsibility to ensure plans are printed correctly and to inform third-party printers of this information. The City is not responsible for bidding errors resulting from Bidders' failure to follow this requirement. Bidders must follow the submittal procedures outlined in the documents. The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest. The City of Pueblo will be accepting bids for an infrastructure project funded in part with Community Development Block Grant funding. Certified Section 3 business concerns are encouraged to submit a bid. "Section 3" refers to Section 3 of the Housing and Urban Development Act of 1968 as amended (12 U.S.C. 1701u) and its implementing federal regulations found in 24 C.F.R. 75. The purpose of Section 3 is to ensure that employment and economic opportunities generated by certain financing provided by the U.S. Department of Housing and Urban Development (HUD) are, to the greatest extent feasible, directed to low- and very low-income persons, particularly those who are recipients of government assistance for housing, and to business concerns that provide economic opportunities to low- and very low-income persons. Question Deadline 02/10/2026 at 4:00 PM MT The City of Pueblo has set forth policies and procedures to ensure that employment and economic opportunities generated by Section 3 covered projects, to the greatest extent feasible, are directed to low- and very low-income persons and business concerns. A prime contractor and subcontractor who signs a contract on a Section 3 covered construction project are required, to the greatest extent feasible, to direct employment and business opportunities toward Section 3 residents and Section 3 businesses. Additionally, the contractor and subcontractor are required to implement, to the greatest extent feasible, the City of Pueblo's Section 3 Plan. Pursuant to Executive Orders 11246, as amended, and 11375 on Equal Employment Opportunity, Part 60 4, Construction Contractor Affirmative Action Requirements, and Section 3 of the Housing and Urban Development Act of 1968, as amended, a prime contractor and subcontractor who signs a contract on a Federally assisted construction project are required to take affirmative action toward equal employment opportunity and are required to implement the Colorado Statewide Plan. At pre construction conferences, the successful bidder and his subcontractors shall be required to present and discuss the approach to be taken by the successful bidder and his subcontractors to implement the requirements of affirmative action for equal employment and training in accordance with Executive Orders 11246, as amended, and 11375.

Award

Sidewalks / Parking Lot

$29,432.00

Public - City

Site Work

4

5

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
0
Bidding Soon
196
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

March 20, 2026

Project location map

200 Van Buren St, Pueblo, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.