BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2026 at 8:00 PM

Updated July 18, 2026

Renovation of a military facility in Fort Hood, Texas. Completed plans call for the renovation of a military facility.

The Design-Bid-Build effort includes expansion of hangar doors at Facility B90176 to support the HADES mission and accommodate the ME-11B (Bombardier Global 6500) aircraft. Work involves replacing two existing hangar doors with single 120-foot-wide rolling sectional doors of equal height vertical fabric door with two sections of increased height, requiring major structural modifications to the pre-engineered metal building, including removal and replacement of wind posts, grade beams, spandrel beams, and portions of the concrete slab. Exterior improvements include extending the trench drain and adjusting adjacent man-doors and wall-mounted utility lines. Interior work consists of installing higher-capacity motors for the new doors, refinishing and restriping affected hangar floor areas, making minor partition and finish modifications to support new flight group requirements, and evaluating and replacing fan and motor control centers of existing Big Ass Fans. Extensive structural, fire suppression, and life safety analyses are required to ensure code compliance and safe integration of all modifications. The target price range for this project is between $4,500,000.00 and $5,500,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. QA date - 7-10-2026 Last day to submit ProjNet questions is seven calendar days prior to bid closure date at Online Portal.

GC Bidding

Military

$5,500,000.00

Public - Federal

Renovation

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
9
Bidding Soon
2,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2026

Project location map

To Be Determined, Fort Hood, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.