BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 30, 2026 at 8:00 PM

Updated March 31, 2026

Site work, paving and new construction of a mixed-use development in Fort Hood, Texas. Working plans call for the construction of a power facility; for site work for a power facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work consists of constructing a new Central Energy Plant to serve the Fort Hood Phantom East District. The Central Energy Plant will supply chilled water to 24 buildings, replacing 24 existing air-cooled chillers, and is not part of the Fort Hood privatized utilities system. Primary facilities include a building housing cooling towers, chillers, associated pumps, controls, and related equipment, along with distribution piping to the supported buildings. The project also includes fire protection and detection systems, Energy Monitoring and Control Systems, sustainability and energy efficiency measures, and required cybersecurity features. Supporting work includes installation and connection of new gas, water, sewer, and electrical utilities; security lighting; paving; walkways; curbs and gutters; storm drainage; site clearing and grading; fencing; landscaping; and signage. Special foundations are required due to expansive and rocky soil conditions, and heating will be provided by a self-contained system. Facilities will be designed for a minimum service life of 40 years in accordance with applicable Department of Defense Unified Facilities Criteria, including requirements for energy efficiency, building envelope performance, and integrated building systems. Location: Fort Hood Phantom East District, Fort Hood, Texas PROJECT INFORMATION: The TARGET PRICE RANGE is between $25,000,000 and $30,000,000 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Power Plant

$30,000,000.00

Public - Federal

New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
125
Bidding Soon
1,988
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2026

Project location map

To Be Determined, Fort Hood, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.