Site work and paving for a road / highway in Kettering, Ohio. Completed plans call for site work for a road / highway.

ENGINEER'S ESTIMATE: Base Bid - $503,500.00 Alternate 1 - $31,000.00 Alternate 2 - $154,000.00 Alternate 3 - $32,000.00 ALTERNATES EXPLANATION: The base bid for this project will include all asphalt portions of Lance Drive and Arbor Boulevard beginning on the East side of Dryden and extending near to the East corporation line where newer pavement begins. Alternate 1 will be utilized for any parts of Lance Drive where the concrete base is deteriorated too far for typical asphalt overlay. Alternate 2 will be utilized to pave Arbor Boulevard West of Dryden Road if the budget allows. Alternate 3 will be utilized if Alternate 2 is used and the concrete base of Arbor Boulevard is deteriorated too far for typical asphalt overlay. PROJECT DESCRIPTION: This work consists of milling, paving, and striping roadways throughout the City of Moraine. BASE BID Pavement Repair, (As Directed by Engineer), Including Surface Course M254 Pavement Planing, 2", Asphalt with Milled Materials Kept by Contractor 1Trackless Tack Coat (0.1 GAL/SY) Asphalt Conc. Surface Course, PG64-22 (448), 2" Thick, Placed in 2 lifts Manhole Adjustment Water Valve Adjustment Maintaining Traffic Gas/Water Valves - Adjusted to Grade (As Directed by Engineer) Centerline, Solid Double Yellow Centerline, Solid Double Yellow Crosswalk, 12" Crosswalk, 24" Edge Line, 4", White Stop Bar ALTERNATE 1 - Pavement Planing, 1.5", Asphalt with Milled Materials Kept by Contractor Pavement Planing, 2", Asphalt with Milled Materials Kept by Contractor Asphalt Concrete, Misc.: Stress Absorbing Membrane Interlayer (SAMI) Asphalt Conc. Surface Course, PG64-22, (448) , 2" Thick, Placed in 2 lifts Asphalt Concrete Surface Course, 422 12.5MM (448), Fiber Type A, 1.5" Thick, Placed in 2 lifts ALTERNATE 2 - Pavement Repair, (As Directed by Engineer), Including Surface Course Trackless Tack Coat (0.1 GAL/SY) Asphalt Conc. Surface Course, PG64-22 (448), 2" Thick, Placed in 2 lifts Manhole Adjustment Water Valve Adjustment Centerline, Solid Double Yellow Combo Arrow ALTERNATE 3 - Pavement Planing, 1.5", Asphalt with Milled Materials Kept by Contractor Pavement Planing, 2", Asphalt with Milled Materials Kept by Contractor Asphalt Concrete, Misc.: Stress Absorbing Membrane Interlayer (SAMI) Asphalt Conc. Surface Course, PG64-22, (448) , 2" Thick, Placed in 2 lifts Asphalt Concrete Surface Course, 422 12.5MM (448), Fiber Type A, 1.5" Thick, Placed in 2 lifts APPROXIMATE AWARD DATE: 03/26/2026 NO PRE-BID MEETING WILL BE HELD. PROJECT COMPLETION DEADLINE: 10/30/2026 Each proposal shall be signed by the full name and business address of each person or company interested in the same; shall be accompanied by a security bond by a bonding company authorized to do business in the State of Ohio, or by a certified check on some solvent bank in the amount of ten percent (10%) of the amount of the submitted proposal, the surety bond or certified check being payable to the City of Moraine, Ohio, as a guarantee that if the proposal is accepted, a contract will be entered into and its performance properly secured by a satisfactory bond in the amount of one hundred percent (100%) of the contract price. The City Council reserves the right to accept or reject any or all proposals; to waive any informalities or irregularities in the bids received or to accept any proposal which is deemed most favorable to the City of Moraine.

Sub-Bidding

Roads / Highways

$503,500.00

Public - City

Paving, Site Work

7

8

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
328
Active Projects
181
Bidding Soon
2,398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 27, 2026

Project location map

Multiple Locations, Kettering, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.