BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2026 at 8:00 PM

Updated March 24, 2026

Site work and paving for a mixed-use development in Holliston, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Town of Holliston DPW - Highway is seeking sealed bids for Sidewalk and Roadway improvements on Gretchen Lane and Andrews Lane in Holliston. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Please review the enclosed Scope of Services and provide any questions in writing to Robert Walker at the Holliston Highway Department, 63 Arch Street, Holliston, MA 01746 before 12:00 PM on February 13, 2026 or via email to Robert Walker at: walkerr@holliston.k12.ma.us Gretchen Lane Roadway and Sidewalk Improvements: Gretchen Lane will be reclaimed and paved, with new sidewalks and driveway aprons installed after the existing ones are removed. Following reclamation, the roadway will be graded toward the catch basins with a 2% slope from the centerline of the road to the gutter and compacted using a ten-ton single-drum vibratory soil compactor. The edge of the roadway will be grubbed out to meet the height of the new monolithic berm. A 2_-inch layer of Superpave Intermediate Course 12.5 will then be installed. Once the intermediate course is in place, sidewalk construction may begin and all structures will be adjusted. Any existing 24-inch manhole castings will be replaced with 26-inch manhole castings, which will be provided by the Town of Holliston DPW. After asphalt is removed from the sidewalk and driveway areas and the subgrade is prepared, the gravel base will be compacted using a vibratory roller weighing no less than 2 tons. Sidewalks and driveways will receive 1_ inches of Superpave Intermediate Course 12.5 followed by 1_ inches of Superpave Surface Course 9.5. Each course will be compacted with a roller weighing no less than 2 tons. Two curb ramps will be installed at the Central Street end of Gretchen Lane. The roadway will then be paved with 1_ inches of Superpave Surface Course 9.5. Once roadway paving is complete, driveway surfaces will be paved with the surface course. Final work will include loaming and seeding along sidewalk edges and behind the berm. Andrew Lane Roadway and Sidewalk Improvements: Andrew Lane will be cold planed, with new sidewalks and driveway aprons installed after the existing sidewalks and aprons are removed. Sidewalk construction may then begin and all structures will be adjusted. Any existing 24-inch manhole castings will be replaced with 26-inch manhole castings, which will be provided by the Town of Holliston DPW. Once the asphalt has been removed from the sidewalk areas and the subgrade has been graded, the gravel base will be compacted using a vibratory roller weighing no less than 2 tons. The edge of the roadway will be grubbed out to meet the height of the new monolithic berm. Sidewalks and driveways will receive 1_ inches of Superpave Intermediate Course 12.5 followed by 1_ inches of Superpave Surface Course 9.5. Each asphalt course will be compacted with a roller weighing no less than 2 tons. Five curb ramps will be installed: one at Gorwin Drive, two at Juniper Road, and two at Chamberlain Street. The roadway will then be paved with 1_ inches of Superpave Surface Course 9.5. Once roadway paving is complete, driveways will be paved with the surface course. Final work will include loaming and seeding along sidewalk edges and behind the berm.

Award

Sidewalks / Parking Lot

$555,706.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
15
Bidding Soon
2,802
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

April 1, 2026

Project location map

Multiple Locations, Holliston, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.