BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated January 21, 2026

Site work for a mixed-use development in Holliston, Massachusetts. Completed plans call for site work for a water / sewer project.

The work involves the like-for-like replacement of the irrigation pumping and control system at the Pinecrest Golf Club in Holliston, MA. The contractor must supply all materials and labor, and the project includes the removal and disposal of the existing Watertronics HCVE-30/305VC Pump Station, disconnecting and reconnecting suction and supply waterlines, electrical reconnections, installation of a new comparable pump station (with the addition of cellular-based remote monitoring and control capabilities), and the start-up and training on the operation of the new system. The new system must include an automatic priming system and an HDPE suction line with appropriate foot valve and float. The contractor is required to have a minimum of five consecutive years of golf course pumping system installation and repair experience, including at least one municipal installation with the proposed equipment provider, and to be an approved installer of the proposed pumping station for at least five years. Proof of insurance and compliance with prevailing wage laws, OSHA certification, and workforce participation requirements are mandatory. Bidders must submit sealed bids addressed to the Town Manager's Office, with all required forms, a bid deposit of at least 5% of the proposed work's value, at least three relevant references, and insurance certificates. All forms requested in the bid documents must be completed and signed. Bids must be received by the stated deadline and must include all costs, with no allowance for price adjustments, fuel, or vehicle surcharges. Bids may be corrected, modified, or withdrawn only before the submission deadline. The Town reserves the right to accept or reject any or all bids, waiving minor informalities, and award the contract to the lowest responsive and responsible bidder based on the total bid price provided.

Sub-Bidding

Water / Sewer

$200,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
754
Active Projects
414
Bidding Soon
4,058
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

April 6, 2026

Project location map

212 Prentice Street, Holliston, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.