BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

Site work and paving for a sidewalk / parking lot in Holliston, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Pedestrian Safety Improvements at the Holliston Town Hall Crosswalk located in the vicinity of 703 Washington Street in Holliston, MA. The work includes installing curb extensions and a Solar Rectangular Rapid Flashing Beacon at the intersection of Jasper Hill Road and Washington Street in front of the Holliston Town Hall. The work to be done under this contract consists of furnishing all necessary labor, materials and equipment required for the Pedestrian Safety Improvement Town Hall Crosswalk at Washington Street in Holliston, MA. The project will include other improvements in accordance with the plans and these Special Provisions. and other incidental items included in the contract documents necessary to complete the Project. The Contractor shall coordinate his work with all utility owners and the Town of Holliston. The locations, general characteristics, and principal details are shown on the plans entitled: Town of Holliston, Massachusetts; Pedestrian Safety Improvements; Town Hall Crosswalk at Washington Street. All work under shall be done in conformance with the 2025 Standard Specifications for Highways and Bridges, the Construction Standard Details in effect as of March 12, 2025, the 1990 Standard Drawings for Signs and Supports, the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Revisions 1, 2, and 3 and the November 2022 Massachusetts Amendments to the MUTCD, the 1968 Standard Drawings for Traffic Signals and Highway Lighting, the latest edition of The American Standard for Nursery Stock, the Plans and these Special Provisions. References within the Standard Specifications to the Massachusetts Department of Transportation or the Engineer shall for the purposes of this Contract be construed to mean the Town of Holliston or its representative. No survey was performed for this Project. The proposed design is based on Nearmap and field data collection. The Contractor shall be responsible to construct sidewalk and pedestrian curb ramps to meet ADA/AAB standards. The Contractor shall verify existing grades and proposed design before construction to avoid any puddling issues or meeting design standards. Provide any questions in writing to Robert Walker at the Holliston Highway Department, 63 Arch Street, Holliston, MA 01746 before 3:00p.m. on August 22, 2025 or via email to Robert Walker at: walkerr@holliston.k12.ma.us

Bid Results

Sidewalks / Parking Lot

$137,986.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
594
Active Projects
138
Bidding Soon
4,511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2025

September 1, 2025

Project location map

703 Washington St, Holliston, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.