BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Site work and paving for a civil project in Holliston, Massachusetts. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Project Culvert Replacement - Arch Street. The scope of Work includes, but is not limited to: traffic management plan, environmental protection measures, flow control and bypass pumping systems, dewatering, removal and disposal of the existing culvert, removal and replacement of the existing asbestos cement water main, coordination and related work associated with the gas main, furnishing and installing a new precast concrete three-sided (open bottom) box culvert, headwalls, precast concrete blocks wingwall and retaining walls, wood guardrail, paving, restorations of all disturbed areas, and all related Work. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Questions regarding requests for Contract Documents to online, tel. 978-888-3350, or Nashoba Blue, Inc., tel. 978-568-1167. Question Deadline 01/02/2026 All questions by prospective Bidders as to the interpretation of the Contact Documents shall be submitted in writing to the Engineer and shall be in its possession at least ten (10) calendar days before the date herein set for the receipt of Bids. All technical questions shall be forwarded to: Ali Parand, P.E. AP Associates, Inc. Phone: (508) 376-2670 Email: ali.parand@ap-associates.com

GC Bidding

Bridges / Tunnels

$450,000.00

Public - City

Paving, Site Work

6

12

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
594
Active Projects
103
Bidding Soon
4,578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

February 13, 2026

Project location map

Arch St, Holliston, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.