Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 31, 2026 at 7:00 PM
Updated February 1, 2026
Site work for an industrial development in San Carlos, California. Completed plans call for site work for a industrial development.
The Shoreway Environmental Center Concrete Pad Side Yard Developments Project includes (1) a base bid for a Container Storage Area for Materials Recovery Facility (MRF) storage containers, which requires constructing a concrete slab alongside the east side of the MRF Building to support stacked storage containers; and (2) a bid alternate for a Parking Pad Area, which requires constructing a concrete slab alongside the east side of the Transfer Station building for truck parking. The work is adjacent to the main driveway and corridors of the facility, and cannot conflict with site operations. Work must be performed after operating hours: Monday to Friday after 6:00 PM, and weekends after 5:00 PM, with roads to return to service by the following Monday morning prior to 2:00 AM. The project must be completed within 60 days from the date when Contract Time commences to run. Bidders are required to self-perform at least 75% of the work with their own workforce, excluding specialty items. A mandatory pre-bid site visit is required, and bids must be submitted electronically. A California B contractor's license is required, and all bidders and listed subcontractors must be registered and qualified to perform public work under Labor Code Section 1725.5. Compliance with all prevailing wage laws and applicable public health requirements is mandatory. The Owner reserves the right to reject any or all bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price, or quality of the work. Question Deadline 02/18/2026 at 4:00 PM PT Bidders must direct all questions about the meaning or intent of Bidding Documents to Owner in writing via email to bids@rethinkwaste.org
Sub-Bidding
Industrial
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2026
April 8, 2026
333 Shoreway Rd, San Carlos, CA
Related To This Project
San Carlos, CA
Bid Date: Feb 17 2026
San Carlos, CA
Bid Date: Feb 19 2026
San Carlos, CA
Bid Date: Mar 25 2026
San Carlos, CA
Bid Date: Jan 20 2026
San Carlos, CA
Bid Date: Jan 21 2026
San Carlos, CA
Bid Date: Feb 17 2026
San Carlos, CA
Bid Date: Oct 31 2025
San Carlos, CA
Bid Date: Jun 21 2019
San Carlos, CA
Bid Date: Sep 11 2020
San Carlos, CA
Bid Date: Sep 02 2025
San Carlos, CA
Bid Date: Sep 02 2025
San Carlos, CA
Bid Date: Jul 28 2025
San Carlos, CA
--
San Carlos, CA
Bid Date: Jun 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
