BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work and paving for a sidewalk / parking lot in Kansas City, Missouri. Completed plans call for site work for a 5,602-square-foot sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of March 20, 2026, project was awarded to Capital Electric Line Builders, awarded amount is $336,357.34 https://www.kansascity.com/news/local/article315028639.html On Saturday, soccer fans will make their way by car, bike and on foot to Kansas City’s riverfront for the KC Current’s opening match. But not by streetcar. Yet. The Kansas City Streetcar Authority has not announced an “early 2026” opening day for the Riverfront extension. However, they are aiming for a May opening, according to spokesperson Donna Mandelbaum. Under construction for two years, the 0.7 mile addition will connect CPKC Stadium, Berkley Riverfront Park and the Missouri River with the rest of the streetcar line. Currently, crews are making sure the train controls and overhead power wires function safely. A Kansas City streetcar pulls into the Berkley Riverfront area on Wednesday, Dec. 17, as preliminary testing on the new streetcar line extension from the River Market began. Al Griffin Today's Featured Beauty Article Best Shampoos for Fine, Thinning Hair: What Actually Works Read the full story ? Starting in April, streetcar operators will begin to practice driving on the new rails. This is when Riverfront residents will regularly hear the dings of the streetcar. That month, some northbound streetcars will drop off passengers at the River Market and continue on to the riverfront. The streetcar will no longer end in a loop through the River Market. Construction is supposed to wrap up on related Riverfront projects by the World Cup, Mandelbaum said. A sculptural riverfront pavilion is expected to be completed around the same time the extension opens. The separately-funded northmost-terminus of the streetcar system will provide seating and cover for streetcar riders with a design that echoes the nearby Missouri River. The city is building a pedestrian and bike bridge from the River Market to the Riverfront that adjoins the streetcar tracks. It is supposed to be completed at the same time as the streetcar extension. Pedestrians and bicyclists going to Current games should stay away from the Grand Boulevard bridge and take the Town of Kansas bridge to the riverfront until the new bridge opens around May, Mandelbaum said. Monthly streetcar ridership has more than doubled over last year after the Main Street extension opened in October. On average, 8,829 people rode the streetcar each day in February 2026, compared to 2,361 daily ridership the year before. Read more at: https://www.kansascity.com/news/local/article315028639.html#storylink=cpy ___________________________________ Port KC is seeking a request for proposals for the services of a qualified contractor to repair and replace 21 areas (5,602 sf) of concrete in Berkley Riverfront Park and the Riverfront Heritage Trail and install 710 sf of new concrete.

Award

Sidewalks / Parking Lot

$336,357.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
1
Bidding Soon
875
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 23, 2026

Project location map

Multiple Locations, Kansas City, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.