BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 23, 2026 at 7:00 PM

Updated February 24, 2026

Site work and paving for a mixed-use development in Topeka, Kansas. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Steel picket fencing shall be provided for the following areas located in the Play Land Park. 1. Sky Trail Retaining Wall: Fencing shall be provided and installed between the existing Sky Trail steel pipe columns indicated as T 5.1, T6, T6.1, and T7 on the supplemental drawings. An optional 8' segment may be located between T5.1 and the existing sidewalk. The fencing shall be surface mounted along the top of the existing concrete retaining wall. Fencing shall be based on existing dimensions between Sky Trail columns. 2. PA-2: Fencing shall be provided and installed along the indicated 24" x 6" concrete mow strip on the north side of PA-2 (points 26A to 79). The fencing shall be mounted on the surface along the top of the existing mow strip (26A to 79) and include the installation of stone columns (26A, 27, 28A, and 79) on existing concrete footings. Placement of columns and fencing shall be compatible with the existing concrete footings. As an option, the fence posts may be core drilled with acceptance by SCP+R. 3. RR-Trickle Channel: Fencing shall be provided and installed along the indicated concrete entry walkway, 12" x 12" curbing, or mow strip on the west side of the RR tracks and trickle channel. The fencing shall be surface mounted along the top of the existing concrete walkway (20 to 14A), and include the installation of stone columns (14A, 14B, 38, 16, 17, 17A, 17B, 17C, 17D, 17E, 20) on existing concrete footings. Placement of columns and fencing shall be compatible with the existing concrete footings. As an option, the fence posts may be core drilled with acceptance by SCP+R. 4. Note: Meri-Crete currently has the concrete placement contract for all concrete column footings, walks, curbing, and mow strips indicated. Coordination of fence (post) placement with Meri-Crete's placement of concrete may be considered for acceptance by SCP+R. Shawnee County reserve the right to accept or reject any part of, or all of, any bid or proposal. Shawnee County Parks and Recreation Department (SCP+R) is seeking proposals from qualified contractors to provide all labor, materials, construction equipment, coordination, and supervision necessary for the fencing and column services of the Gage Park Play Land prior to June 2026. All questions regarding this RFP should be submitted through the Shawnee County Online Bid Portal. The last day to submit questions: 02/10/2026 by 5:00 pm (local time). Questions submitted after this deadline will not be answered.

Bid Results

Playgrounds / Parks / Athletic Fields

$51,143.00

Public - County

Paving, Site Work

5

3

4

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
1
Bidding Soon
715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

April 14, 2026

Project location map

635 SW Gage Blvd, Topeka, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.