BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work and paving for a mixed-use development in Northfield, Ohio. Completed plans call for site work for a sidewalk / parking lot; and road / highway.

The Engineer’s Opinion of Probable Cost for Construction (Engineer’s Estimate) is: $2,166,525.31 The Engineer’s Opinion of Probable Cost for the Alternate Construction (Engineer’s Estimate) is: $2,415,331.06 The work to be performed consists of furnishing all labor, equipment, tools, materials, and incidentals required for the complete removal and replacement of approximately 3,648 linear feet of existing 24-foot and 26-foot wide asphalt street pavement. This includes the removal of 6,825 linear feet of concrete curb and installing 6,860 linear feet of new concrete curb, full-depth asphalt removal and replacement at 15-inches thick, and installation of approximately 6,866 linear feet of new 8-inch underdrain. The project also includes removing and replacing 84 residential driveway aprons, removing and replacing approximately 631 linear feet of 12-inch storm sewer, 1,269 linear feet of 15-inch storm sewer, 843 linear feet of 18-inch storm sewer, 98 linear feet of 21-inch storm sewer, 5 linear feet of 24-inch storm sewer, 45 linear feet of 30-inch storm sewer, 23 street catch basins, and 13 storm sewer manholes. An alternate includes 4,489 linear feet of 5-foot wide concrete sidewalk and 12 ADA concrete curb ramps. Bidders must include the Bid Form and entire Contract Document booklet, along with any addenda, with their bid. All bidding documents must be obtained from the office of the Village Engineer; duplicates will be considered unacceptable. Each bidder must furnish a Bid Guaranty and Contract Bond according to Section 153.54 of the Ohio Revised Code, issued by a Surety Company licensed in Ohio. Proposals must contain the full name of all parties submitting and interested in the proposal, and bidders must provide evidence of experience on similar projects. The project is to be completed within 180 days after the Notice to Proceed. Compliance with State of Ohio prevailing wage rates is required for public improvements in Summit County and Northfield, Ohio.

GC Bidding

Roads / Highways

$2,166,525.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
197
Bidding Soon
1,930
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

March 30, 2026

Project location map

Milford Drive, Northfield, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.