Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 2, 2026 at 7:00 PM
Updated February 3, 2026
Site work and paving for a mixed-use development in Northfield, Ohio. Completed plans call for site work for a sidewalk / parking lot; and road / highway.
The Engineer’s Opinion of Probable Cost for Construction (Engineer’s Estimate) is: $2,166,525.31 The Engineer’s Opinion of Probable Cost for the Alternate Construction (Engineer’s Estimate) is: $2,415,331.06 The work to be performed consists of furnishing all labor, equipment, tools, materials, and incidentals required for the complete removal and replacement of approximately 3,648 linear feet of existing 24-foot and 26-foot wide asphalt street pavement. This includes the removal of 6,825 linear feet of concrete curb and installing 6,860 linear feet of new concrete curb, full-depth asphalt removal and replacement at 15-inches thick, and installation of approximately 6,866 linear feet of new 8-inch underdrain. The project also includes removing and replacing 84 residential driveway aprons, removing and replacing approximately 631 linear feet of 12-inch storm sewer, 1,269 linear feet of 15-inch storm sewer, 843 linear feet of 18-inch storm sewer, 98 linear feet of 21-inch storm sewer, 5 linear feet of 24-inch storm sewer, 45 linear feet of 30-inch storm sewer, 23 street catch basins, and 13 storm sewer manholes. An alternate includes 4,489 linear feet of 5-foot wide concrete sidewalk and 12 ADA concrete curb ramps. Bidders must include the Bid Form and entire Contract Document booklet, along with any addenda, with their bid. All bidding documents must be obtained from the office of the Village Engineer; duplicates will be considered unacceptable. Each bidder must furnish a Bid Guaranty and Contract Bond according to Section 153.54 of the Ohio Revised Code, issued by a Surety Company licensed in Ohio. Proposals must contain the full name of all parties submitting and interested in the proposal, and bidders must provide evidence of experience on similar projects. The project is to be completed within 180 days after the Notice to Proceed. Compliance with State of Ohio prevailing wage rates is required for public improvements in Summit County and Northfield, Ohio.
GC Bidding
Roads / Highways
$2,166,525.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2026
March 30, 2026
Milford Drive, Northfield, OH
Related To This Project
Northfield, OH
Bid Date: Oct 10 2025
Northfield, OH
Bid Date: Aug 02 2019
Northfield, OH
Bid Date: Aug 28 2025
Northfield, OH
Bid Date: Jul 11 2025
Northfield, OH
Bid Date: May 15 2025
Northfield, OH
Bid Date: Apr 09 2025
Northfield, OH
Bid Date: Feb 13 2025
Northfield, OH
Bid Date: Feb 07 2025
Northfield, OH
Bid Date: Dec 03 2024
Northfield, OH
Bid Date: Dec 23 2024
Northfield, OH
Bid Date: Jul 25 2024
Northfield, OH
--
Northfield, OH
Bid Date: Jun 27 2024
Northfield, OH
Bid Date: May 09 2024
Northfield, OH
Bid Date: May 09 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
