BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work and paving for a mixed-use development in Delray Beach, Florida. Completed plans call for site work for a service station / car wash facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

LEBOLO Construction is soliciting competitive bids from qualified contractors for the installation of electrical and civil infrastructure to support six (6) new EV Charging Stations, with provisions for three (3) future EV Charging Stations. The scope of work includes, but is not limited to, sawcutting and trenching of the existing parking lot; installation of all required conduit, wiring, and associated electrical components; relocation of existing switchgear cabinets; and the installation of new Automatic Transfer Switches (ATS), breakers, and related equipment. Additional work includes concrete removal and replacement, asphalt restoration, and any required landscaping repairs. This project will be executed on an accelerated schedule. Bidders are required to provide two (2) separate pricing proposals: 1. Pricing based on an expedited schedule consisting of six (6) ten-hour workdays per week. 2. Pricing based on a standard schedule during normal business hours. The EV Charging Stations will be furnished by Palm Tran.

Sub-Bidding

Service Station / Car Wash

$2,000,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
114
Bidding Soon
1,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 2, 2026

Project location map

100 N Congress Ave, Delray Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.